My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 4:01:59 PM
Creation date
12/9/2025 3:59:50 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Addenda
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Addendum 1 Page 13 <br />CITY OF EVERETT ⋅ 3200 Cedar Street ⋅ Everett, WA 98201 ⋅ (425) 257-8800 ⋅ Fax (425) 257-8882 <br /> <br />Item 20 - SECTION 33 01 30.50 BYPASSING AND DEWATERING: <br />Add new attached Specification 33 01 30.50_Bypassing and Dewatering. <br />Item 21 - SPECIFICATION 41 22 13.13 BRIDGE CRANES: <br />Delete Table under GENERAL REQUIREMENTS 2.01.J and Replace with <br />the following: <br /> <br />ANSWERS TO QUESTIONS SUBMITTED FOR CLARIFICATION <br />Q1 – Attached you will find our substitution request for metal roof panels on the Port <br />Gardner storage facility. I’ve also attached our data sheet, current color offerings and <br />some similar projects. <br />We will not be considering substitution requests at this time. Per Section 00 72 <br />00, Section 8.5, 1st paragraph, 2nd sentence, only the Contractor may request <br />substitutions. Per Section 01 25 00, Paragraph 1.7.C, requests for substitutions <br />will not be considered during the bid period. <br />Q2 – I have attached a substitution request for metal wall panels for the Port Garnder <br />storage facility.
The URL can be used to link to this page
Your browser does not support the video tag.