Laserfiche WebLink
Addendum 1 Page 14 <br />CITY OF EVERETT ⋅ 3200 Cedar Street ⋅ Everett, WA 98201 ⋅ (425) 257-8800 ⋅ Fax (425) 257-8882 <br /> <br />I have also attached a data sheet for our equivalent panel, a list of some projects and <br />our current color offers. <br />We will not be considering substitution requests at this time. Per Section 00 72 <br />00, Section 8.5, 1st paragraph, 2nd sentence, only the Contractor may request <br />substitutions. Per Section 01 25 00, Paragraph 1.7.C, requests for substitutions <br />will not be considered during the bid period. <br />Q3 – Attached is our substitution request for the soffit panels. I’ve attached our data <br />sheet, some kynar paint info and our current colors. <br />We will not be considering substitution requests at this time. Per Section 00 72 <br />00, Section 8.5, 1st paragraph, 2nd sentence, only the Contractor may request <br />substitutions. Per Section 01 25 00, Paragraph 1.7.C, requests for substitutions <br />will not be considered during the bid period. <br />Q4 – Is it necessary for all parties in a joint venture or partnership to attend the <br />mandatory pre-bid meetings? <br />No, it is not mandatory for all parties forming a joint venture, partnership, etc. to <br />attend one of the pre-bid meetings. It is mandatory for at least one of the parties <br />within the joint venture, partnership, etc. to attend one of the pre-bid meetings <br />prior to submitting a bid on the project. <br />