My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 4:01:59 PM
Creation date
12/9/2025 3:59:50 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Addenda
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Addendum 1 Page 14 <br />CITY OF EVERETT ⋅ 3200 Cedar Street ⋅ Everett, WA 98201 ⋅ (425) 257-8800 ⋅ Fax (425) 257-8882 <br /> <br />I have also attached a data sheet for our equivalent panel, a list of some projects and <br />our current color offers. <br />We will not be considering substitution requests at this time. Per Section 00 72 <br />00, Section 8.5, 1st paragraph, 2nd sentence, only the Contractor may request <br />substitutions. Per Section 01 25 00, Paragraph 1.7.C, requests for substitutions <br />will not be considered during the bid period. <br />Q3 – Attached is our substitution request for the soffit panels. I’ve attached our data <br />sheet, some kynar paint info and our current colors. <br />We will not be considering substitution requests at this time. Per Section 00 72 <br />00, Section 8.5, 1st paragraph, 2nd sentence, only the Contractor may request <br />substitutions. Per Section 01 25 00, Paragraph 1.7.C, requests for substitutions <br />will not be considered during the bid period. <br />Q4 – Is it necessary for all parties in a joint venture or partnership to attend the <br />mandatory pre-bid meetings? <br />No, it is not mandatory for all parties forming a joint venture, partnership, etc. to <br />attend one of the pre-bid meetings. It is mandatory for at least one of the parties <br />within the joint venture, partnership, etc. to attend one of the pre-bid meetings <br />prior to submitting a bid on the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.