Port Gardner Storage Facility - Facility Construction Package Bypassing and Dewatering <br />Project No. 157889 33 01 30.50 - 6 <br /> <br />4. Include the name and phone number of the emergency cleanup contractor and <br />industrial hygienist. <br />5. Include the Contractor’s responsible parties for response including names, phone <br />numbers, and responsibilities. <br />2.05 CONTRACTOR NOISE RESTRICTIONS <br />A. Noise Control: Contractor shall comply with local, State and Federal noise limitation <br />requirements. <br />B. Contractor shall be required to limit noise production by using special mufflers, barriers, <br />enclosures, equipment positioning, and other approved methods. <br />2.06 TEMPORARY BRIDGES AND RAMPS <br />A. Design and provide suitable temporary bridges or temporary road ramps where <br />necessary for the maintenance of vehicular and pedestrian traffic in accordance with the <br />requirements of the encroachment and traffic control permits issued by the government <br />agency controlling the right-of-way. <br />1. Bridges and ramps shall be designed for HS20-44 traffic load If placed in areas of <br />heavy traffic, additional requirements shall apply. <br />2. Field verify ADA access is maintained where bridges or ramps are placed for <br />pedestrian access. <br />B. The Contractor shall assume responsibility for the maintenance, sufficiency and safety of <br />all such temporary work on bridges and for any damage that may result from their failure <br />or their improper construction, maintenance, or operation. <br />C. Bypass piping crossing major intersections or access to commercial and/or residential <br />property shall be buried. Any temporary closing of intersections or streets for bypass <br />pumping will require approval by the agency with jurisdiction and/or the City Traffic <br />Engineer as part of the Contractor's Traffic Control Plan. <br />PART 3 EXECUTION <br />3.01 GENERAL <br />A. Completely dewater portions of the pipeline where required to complete the Work. <br />B. Any diversion configurations that deviate from that shown in the plans will require <br />approval by the Construction Manager. <br />C. Sewer Diversion shall be done in such a manner as not to damage private or public <br />property or create a nuisance or public menace. Flush diversion pipes with potable or <br />reclaimed water and drain prior to disassembly. <br />3.02 INSPECTION <br />A. The Contractor shall inspect the entire bypass pumping and piping system for leaks for <br />spills on an hourly basis. The Contractor shall also create an inspection log and shall