My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 4:01:59 PM
Creation date
12/9/2025 3:59:50 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Addenda
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Port Gardner Storage Facility - Facility Construction Package Bypassing and Dewatering <br />Project No. 157889 33 01 30.50 - 6 <br /> <br />4. Include the name and phone number of the emergency cleanup contractor and <br />industrial hygienist. <br />5. Include the Contractor’s responsible parties for response including names, phone <br />numbers, and responsibilities. <br />2.05 CONTRACTOR NOISE RESTRICTIONS <br />A. Noise Control: Contractor shall comply with local, State and Federal noise limitation <br />requirements. <br />B. Contractor shall be required to limit noise production by using special mufflers, barriers, <br />enclosures, equipment positioning, and other approved methods. <br />2.06 TEMPORARY BRIDGES AND RAMPS <br />A. Design and provide suitable temporary bridges or temporary road ramps where <br />necessary for the maintenance of vehicular and pedestrian traffic in accordance with the <br />requirements of the encroachment and traffic control permits issued by the government <br />agency controlling the right-of-way. <br />1. Bridges and ramps shall be designed for HS20-44 traffic load If placed in areas of <br />heavy traffic, additional requirements shall apply. <br />2. Field verify ADA access is maintained where bridges or ramps are placed for <br />pedestrian access. <br />B. The Contractor shall assume responsibility for the maintenance, sufficiency and safety of <br />all such temporary work on bridges and for any damage that may result from their failure <br />or their improper construction, maintenance, or operation. <br />C. Bypass piping crossing major intersections or access to commercial and/or residential <br />property shall be buried. Any temporary closing of intersections or streets for bypass <br />pumping will require approval by the agency with jurisdiction and/or the City Traffic <br />Engineer as part of the Contractor's Traffic Control Plan. <br />PART 3 EXECUTION <br />3.01 GENERAL <br />A. Completely dewater portions of the pipeline where required to complete the Work. <br />B. Any diversion configurations that deviate from that shown in the plans will require <br />approval by the Construction Manager. <br />C. Sewer Diversion shall be done in such a manner as not to damage private or public <br />property or create a nuisance or public menace. Flush diversion pipes with potable or <br />reclaimed water and drain prior to disassembly. <br />3.02 INSPECTION <br />A. The Contractor shall inspect the entire bypass pumping and piping system for leaks for <br />spills on an hourly basis. The Contractor shall also create an inspection log and shall
The URL can be used to link to this page
Your browser does not support the video tag.