My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 4:01:59 PM
Creation date
12/9/2025 3:59:50 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Addenda
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 01 12 16 - 10 <br />Port Gardner Storage Facility - Facility Construction Package WO# UP-3525 <br /> <br /> <br />01 12 16 - 10 WORK SEQUENCE <br />1) A high-level construction scope of work for the WMVD project is depicted <br />on Exhibits A-4 attached to this specification section. The Exhibits <br />indicate estimated construction timelines for the WMVD Construction <br />Package 1 and Construction Package 2. The actual construction timelines <br />and sequencing will be determined by the WMVD contractors after PGSF <br />Contract award. <br />2) As indicated on the Exhibit A-4.6, installation of the WMVD pipelines <br />through southern West Marine View Drive off-ramp / Lower Norton Ave. <br />will impact access to the PGSF Facility site and will require an alternate <br />traffic routing. Actual timelines and durations of these traffic impacts shall <br />be coordinated with the Owner and Owner’s Representative and may <br />differ from those stated in this Specifications once all concurrent WMVD <br />contract schedules are coordinated <br />3) The Owner is in a process of negotiating an alternate shared northbound <br />access construction easement through the Port Terminal property that <br />may be available to the PGSF and WMVD Contractors. Haul and access <br />route will be detailed following Contract award. For bidding purposes, no <br />weight, height, or length restrictions other than those required for <br />interstate commerce are anticipated for the southern access route <br />through the Port of Everett to the PGSF site. <br />d. If construction sequencing and staging between the two packages overlap, the <br />Owner may allow the PGSF Facility Package contractor to leave connection <br />point excavation and trenches open at connection points without requirement <br />for backfill. However, Contractor’s bid shall include full backfill and restoration <br />at these connection points. At each connection point, the Contractor shall <br />install 2”x4” wood post to surface to mark end of the pipes. <br />15. All existing monitoring wells on the project site (unless noted otherwise in the <br />drawings), including those enumerated in the Geotechnical Report (see Volume 7, <br />Attachment B), as well as those shown on the drawings (see Drawings CE-10-1002 <br />and CE-10-1003) shall be demolished and/or , decommissioned and abandoned by <br />the Contractor in accordance with the requirements for well decommissioning and <br />abandonment in compliance with WAC 173-160-381. <br />Monitoring wells interfering with new work construction may be decommissioned <br />and abandoned when necessary for work to proceed on schedule. Monitoring wells <br />not interfering with new work shall not be abandoned and decommissioned until all <br />work involving excavation and backfilling, dewatering, pile driving, sheet pile <br />installation and extraction; installation of the soil cement column wall; and <br />construction of all subsurface facilities have been completed, and accepted by the <br />Owner’s Representative. Monitoring wells not interfering with new work shall be <br />protected from damage until abandonment and decommissioning commences. <br />C. Area 25 Temporary Roof Covers <br />1. Do not remove Area 25 temporary roof covers until new, permanent roof <br />coverings are ready to be installed.
The URL can be used to link to this page
Your browser does not support the video tag.