Laserfiche WebLink
City of Everett 01 12 16 - 11 <br />Port Gardner Storage Facility - Facility Construction Package WO# UP-3525 <br /> <br /> <br />01 12 16 - 11 WORK SEQUENCE <br />PART 2 - PRODUCTS (NOT USED) <br />PART 3 - EXECUTION <br />3.1 GENERAL <br />A. Contractor to apply / submit for Discharge Authorization Request and obtain City permit <br />approval prior to placing any dewatering fluids (groundwater/stormwater/cleaning and <br />testing water) into the City sewer system. Make application on the Industrial Discharge <br />Approval Request Form in Section 01 99 90. <br />3.2 OPERATION <br />A. Preparation: <br />1. Required equipment and materials shall be on site a minimum of 24 hours before <br />commencing any work covered in a MOP. <br /> <br />EXHIBIT A TO SECTION 01 12 16 FOLLOWS <br /> <br />END OF SECTION 01 12 16