My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 12/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction Inc. 12/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 10:39:10 AM
Creation date
12/17/2025 10:24:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/17/2025
Council Approval Date
12/10/2025
Department
Public Works
Department Project Manager
Amie Campbell
Subject / Project Title
Water Main Y, Phase 2
Tracking Number
0005048
Total Compensation
$2,020,202.02
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 1 – GEN REQUIREMENTS October 2025 <br />Work Order No. UP 3814 SP-111 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />Upon completion of pipe installation and trench backfilling to specifications, promptly <br />restore street, driveway and sidewalk surfaces using Temporary Pavement Patch in <br />accordance with Section 5-06.3(6) TEMPORARY PAVEMENT PATCHING and permit <br />public use and access for City inspection activities. <br />Parking spaces are normally very limited in most areas of the project and the Contractor <br />will be required to cooperate with the City in resolving parking issues. In general, <br />businesses and residents who rely on on-street parking and are displaced by the <br />construction shall be given priority for the nearest available parking location. The <br />Contractor’s employees may be required to park their personal vehicles away from the <br />area of construction. <br />This 1-08.4(2) is not a complete list of all constraints that may be in the Contract <br />Documents. Contractor is responsible for all constraints in the Contract Documents. <br />1-08.5 Time for Completion <br />Delete all of 1-08.5 and substitute the following: <br />1-08.5(1) General <br />The Contractor shall complete all physical Contract Work within the number of “working <br />days” stated in the Contract Provisions or as extended by the Engineer in accordance <br />with Section 1-08.8. Every day will be counted as a “working day” unless it is a <br />nonworking day or an Engineer determined unworkable day. A nonworking day is <br />defined as a Saturday, a Sunday, a whole or half day on which the Contract specifically <br />prohibits Work on the critical path of the Contractor’s approved progress schedule, or <br />one of these holidays: January 1, the third Monday of January, the third Monday of <br />February, Memorial Day, June 19, July 4, Labor Day, November 11, Thanksgiving Day, <br />the day after Thanksgiving, and Christmas Day. When any of these holidays fall on a <br />Sunday, the following Monday shall be counted a nonworking day. When the holiday <br />falls on a Saturday, the preceding Friday shall be counted a nonworking day. The days <br />between December 25 and January 1 will be classified as nonworking days. <br />An unworkable day is defined as a half or whole day the Engineer declares to be <br />unworkable because of weather or conditions caused by the weather that prevent <br />satisfactory and timely performance of the Work shown on the critical path of the <br />Contractor’s approved progress schedule. Other conditions beyond the control of the <br />Contractor may qualify for an extension of time in accordance with Section 1-08.8. <br />Contract Time shall begin on the effective date of the Notice to Proceed. The Contract <br />Documents may specify another starting date for Contract Time, in which case, Contract <br />Time will begin on the starting date the Contract Documents specify. <br />Each working day shall be charged to the Contract as it occurs, beginning on the <br />effective date of the Notice to Proceed, unless otherwise provided in the Contract <br />Documents, until the Contract Work is physically complete. Each week the Engineer will <br />provide the Contractor a statement that shows the number of working days: (1) charged <br />to the Contract the week before; (2) specified for the physical completion of the Contract; <br />and (3) remaining for the physical completion of the Contract. The statement will also <br />show the nonworking days and partial or whole day the Engineer declares as <br />unworkable. Within 14 calendar days after the date of each statement, the Contractor <br />shall file a written protest of any alleged discrepancies in it. To be considered by the <br />Engineer, the protest shall be in sufficient detail to enable the Engineer to ascertain the <br />basis and amount of time disputed. By not filing such detailed protest in that period, the <br />Contractor shall be deemed as having accepted the statement as correct. If the <br />Contractor elects to work ten hours a day and four days a week (a 4-10 schedule) and <br />the fifth day of the week in which a 4-10 shift is worked would ordinarily be charged as
The URL can be used to link to this page
Your browser does not support the video tag.