My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 12/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction Inc. 12/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 10:39:10 AM
Creation date
12/17/2025 10:24:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/17/2025
Council Approval Date
12/10/2025
Department
Public Works
Department Project Manager
Amie Campbell
Subject / Project Title
Water Main Y, Phase 2
Tracking Number
0005048
Total Compensation
$2,020,202.02
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 1 – GEN REQUIREMENTS October 2025 <br />Work Order No. UP 3814 SP-129 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />Acceptance of final payment by the Contractor, a Subcontractor or material or <br />Equipment supplier shall constitute a waiver of Contract Claims by that payee, <br />except those Contract Claims previously timely and completely submitted that <br />remain pending at the time of final payment, provided that Contractor specifically so <br />notifies the City in writing prior to the City making such final payment. Payment by <br />the City shall not release the Contractor or its Surety from any obligation under the <br />Contract or under the payment and performance bond. <br />Upon completion of all Work and after final inspection, the amount due the <br />Contractor under the Contract will be paid based upon the final estimate made by <br />the Engineer and presentation of a Final Contract Voucher Certification signed by <br />the Contractor. Such voucher shall be deemed a release of all claims of the <br />Contractor unless a claim is filed in accordance with the requirements of 1-09.11 <br />DISPUTES AND CLAIMS and is expressly excepted from the Contractor's <br />Certification on the Final Contract Voucher Certification. <br />If the Contractor fails, refuses, or is unable to sign and return the Final Contract <br />Voucher Certification or any other documentation required for completion and final <br />acceptance of the Contract, the City reserves the right to establish a Completion <br />Date (for the purpose of meeting the requirements of RCW 60.28) and unilaterally <br />accept the Contract. Unilateral final acceptance will occur only after the Contractor <br />has been provided the opportunity, by written request from the City, to voluntarily <br />submit such documents. If voluntary compliance is not achieved, formal notification <br />of the impending establishment of a Completion Date and unilateral final <br />acceptance will be provided by certified mail or by email with delivery confirmation <br />from the City to the Contractor, which will provide 30 calendar days for the <br />Contractor to submit the necessary documents. The 30 calendar day period will <br />begin on the date the certified mail or email with delivery confirmation is received <br />by the Contractor. If Contractor compliance is not achieved by the end of such 30- <br />day period, the City will unilaterally sign the Final Contract Voucher Certification. <br />The date the City Council accepts the Work shall constitute the Completion Date <br />and the final acceptance date. The reservation by the City to unilaterally accept the <br />Contract will apply to Contracts that are Physically Completed in accordance with <br />Section 1-08.5, or for Contracts that are terminated in accordance with Section 1- <br />08.10. Unilateral final acceptance of the Contract by the City does not in any way <br />relieve the Contractor of its responsibility to comply with all Federal, State, tribal, or <br />local laws, ordinances, and regulations that affect the Work under the Contract. <br />1-09.9(5) Back Charges to Contractor <br />The Contractor shall pay the City on demand everything charged to it under the terms <br />of this Contract. Such charges may be deducted by the City from money due or to <br />become due to the Contractor under the Contract. The City may recover such charges <br />from the Contractor or from its Surety. <br />Contractor agrees to pay the costs of overtime or excessive inspection and observation <br />costs incurred by the City. Overtime inspection shall include inspection required during <br />Saturdays, Sundays, City holidays and weekdays in excess of 40 hours per week or <br />outside of normal working hours and inspections or observations that result in an <br />inspector or observer working more than 40 hours in a week. Costs of such overtime or <br />excessive inspection or observation include architecture, engineering, construction <br />management services, inspection, general supervision, and overhead expenses that are <br />directly chargeable to the overtime or excessive work. Contractor agrees that City will <br />deduct such charges from payments due the Contractor. In the event the City issues a <br />Change Order requiring the Contractor to work in excess of the established schedule of <br />working hours, the City will not charge the Contractor for associated inspection costs.
The URL can be used to link to this page
Your browser does not support the video tag.