My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 12/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction Inc. 12/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 10:39:10 AM
Creation date
12/17/2025 10:24:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/17/2025
Council Approval Date
12/10/2025
Department
Public Works
Department Project Manager
Amie Campbell
Subject / Project Title
Water Main Y, Phase 2
Tracking Number
0005048
Total Compensation
$2,020,202.02
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 1 – GEN REQUIREMENTS October 2025 <br />Work Order No. UP 3814 SP-130 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />The Contractor shall compensate the City for the actual costs of engineering, inspection, <br />general supervision, right-of-way costs, permit fees, overhead expenses, and any other <br />ascertainable direct costs to the City that are directly chargeable to the Work and that <br />accrue during the period of such extension. The actual costs do not include charges for <br />final inspection and preparation of the final payment by the City. <br />1-09.9(6) Retainage <br />Pursuant to RCW Chap. 60.28, a sum of five percent of the monies earned by the <br />Contractor will be retained from progress estimates. In addition to protecting the interests <br />of those identified in RCW Chap. 60.28, such retainage will be used as a trust fund for <br />the protection of the City. <br />At the option of the Contractor, monies retained under the provisions of RCW 60.28 will <br />be: <br />1. Retained in a fund by the City, or <br />2. Deposited by the City in an interest-bearing escrow account in a bank, mutual <br />saving bank, or savings and loan association. Interest on monies so retained <br />shall be paid to the Contractor in accordance with requirements of this section. <br />Deposits are to be in the name of the City and may not be withdrawn without <br />the City’s written authorization. The City will issue a check representing the <br />sum of the monies reserved, payable to the bank or trust company. Such check <br />shall be converted into bonds and securities chosen by the Contractor as the <br />interest accrues Bank and Contractor will execute an escrow agreement in the <br />form provided by the City. <br />3. Released after submission of fully executed retainage bond in the form <br />provided by the City. <br />The Contractor shall designate the option desired at the time the Contract is executed. <br />If the Contractor in chooses option 2, deposit in escrow account, Contractor agrees to <br />assume full responsibility to pay all costs that may accrue from escrow services, <br />brokerage charges or both, and further agrees to assume all risks in connection with the <br />investment of the retained percentages in securities. The City may also, at its option, <br />accept a bond in lieu of retainage. <br />Retainage will be released when all of the following conditions are satisfied: <br />1. Sixty days have elapsed following the completion of all Work specified in the <br />Contract; and <br />2. The Contractor fulfilled all of all obligations of the Contractor under the <br />Contract, including, but not limited to, the Contractor’s furnishing all <br />documentation required by Contract and law; and <br />3. A release has been obtained from the Washington State Department of <br />Revenue; and <br />4. Affidavits of Wages Paid for the Contractor and all Subcontractors are on file <br />with the City (RCW 39.12.040); and <br />5. A release has been obtained from the Washington State Department of Labor <br />& Industries and the Washington State Employment Security Department; and <br />6. All claims, as provided by law, filed against the retainage have been resolved. <br />In the event claims are filed and provided the conditions one through five are <br />met, the Contractor will be paid the retained percentage less an amount <br />sufficient to pay any such claims together with a sum determined by the City <br />sufficient to pay the cost of claims and attorney’s fees.