Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br />Water Main Replacement “Y” – Ph 2 Div B – BID ITEM DESCRIPTIONS <br />Work Order No. UP 3814 SP-24 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />The unit price per lineal foot for the final saw-cutting of concrete curb and gutter, sidewalk, and <br />driveway shall be full compensation for all labor, material, tools, and equipment necessary to <br />satisfactorily complete the Work as specified in Section 2-02.3(3) of these Special Provisions and <br />as shown on the Plans. The unit price per lineal foot for the final saw-cutting of concrete curb and <br />gutter, sidewalk, and driveway includes, but is not limited to, the saw-cutting necessary for the final <br />joint between existing concrete sidewalk, driveway, or curb and permanent concrete repair. <br />Include cost of cleanup by vacuum collection and disposal of the cuttings slurry with this bid item <br />as there will be no separate payment for cleanup. <br /> Foundation Material, Class A or B <br />Specification Section 2-03 <br />Measurement and Payment: Unit Price per Ton (TON) <br />Measurement for Foundation Material, Class A or B shall be by the ton, recorded on certified weight <br />tickets in accordance with 1-09.2 WEIGHING EQUIPMENT, and placed within the limits of <br />dimensions defined in the Work, descriptions for other bid items, shown on the Plans, or COE <br />Standard Drawings, or as otherwise approved by the Engineer. <br />The unit price bid per ton shall constitute full compensation for all labor, tools, materials, and <br />equipment required to furnish, place, and compact foundation material as specified in the Standard <br />Specifications, these Special Provisions and as shown on COE Standard Drawing No. 614. <br />The unit price for this bid item includes all costs for dewatering and over-excavation, removal, haul, <br />and disposal of unsuitable subgrade material below the pipe zone or roadway subgrade. <br /> Gravel Borrow Incl. Haul <br />Specification Section 2-03 <br />Measurement and Payment: Unit Price per Ton (TON) <br />Measurement for Gravel Borrow shall be by the ton, recorded on certified weight tickets in <br />accordance with 1-09.2 WEIGHING EQUIPMENT, and placed within the limits of dimensions <br />defined in the Work, descriptions for other bid items, shown on the Plans, or COE Standard <br />Drawings, or as otherwise approved by the Engineer. <br />Gravel borrow shall be limited to maximum trench widths defined in the work descriptions for other <br />bid items. <br />The unit price per ton, based on certified weight tickets, for gravel borrow shall be full compensation <br />for all labor, material, tools and equipment necessary to furnish imported gravel borrow for trench <br />backfill where Engineer has determined native soils are not suitable for backfill, and other Work as <br />required, from a Contractor-supplied source in accordance with 2-03.3(14)J of the Standard <br />Specifications and these Special Provisions. <br />The unit price for gravel borrow shall include all costs of furnishing, hauling, stockpiling, placing, <br />grading, and compacting the material in place. <br />The unit price for this bid item includes all costs for removing, loading, and disposing of displaced <br />unsuitable material, including haul. <br /> Work Access – Bridge 645W Water Line and Supports <br />Specification Section 6-01 <br />Measurement and Payment: Lump Sum (LS) <br />Measurement for Work Access – Bridge 645W Water Line and Supports shall be as follows: <br />October 2025