CITY OF EVERETT SPECIAL PROVISIONS <br />Water Main Replacement “Y” – Ph 2 Div B – BID ITEM DESCRIPTIONS <br />Work Order No. UP 3814 SP-25 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />•First 20% of lump sum upon acceptance of the work access submittal, designed by the <br />contractor. There will be no partial payments of this portion of the lump sum. <br />•40% of lump sum for installing, maintaining and using work access during installation of the <br />new water line and supports. Partial payment shall be based upon the ratio of the installed <br />length of water line and associated supports compared to the total length of water line shown <br />in the approved work access submittal. <br />•20% of lump sum for installing, maintaining and using work access during removal of the <br />existing water line and supports. Partial payment shall be based upon the ratio of the removed <br />length of water line compared to the total length of existing water line shown in the approved <br />work access submittal. Partial payment will only be calculated and made where existing water <br />line and supports are removed. For example, if supports remain after water line removal, the <br />length of water line associated with the remaining supports will not be included. <br />•Final 20% of lump sum upon completed removal of work access as approved by the Engineer. <br />There will be no partial payments of this portion of the lump sum. <br />This lump sum bid item includes all equipment, materials, temporary lighting, spill prevention and <br />containment, labor, installation, and removal, and all other work necessary to meet work access <br />requirements. <br /> Utility Supports on Bridge 645W <br />Specification Section 6-02 <br />Measurement and Payment: Lump Sum (LS) <br />Measurement for Utility Supports on Bridge 645W shall be as follows: <br />•First 20% of lump sum upon approval of Working Drawings. There will be no partial payments <br />of this portion of the lump sum. <br />•Final 80% of the lump sum upon completed installation of utility supports. Partial payment shall <br />be based upon the ratio of completed utility supports installed as approved by the Engineer to <br />the total number of utility supports in the approved Working Drawings. <br />This lump sum bid item includes all equipment, materials, labor, installation, and removal, and all <br />other work necessary to meet utility support requirements, including Work specified in Sections 6- <br />02 and 6-03. <br />“Utility Supports on Bridge 645W” contains the following approximate quantities of materials and <br />work: <br />Water Line Support assemblies supporting horizontal runs of <br />pipe, including drilled holes, epoxy resin, anchor bolts, nuts, <br />washers, pipe rollers, pipe shields, and lateral support struts. <br />70 each <br />Thrust Support Strut assemblies (one horizontal and one vertical) <br />at Abutment 1, including fabricated steel, drilled holes, epoxy <br />resin, pipe straps welded to pipe shields, anchor bolts, nuts, and <br />washers. <br />2 each <br />Thrust Support Strut assembly (vertical) at Pier 5, including <br />fabricated steel, drilled holes, epoxy resin, pipe straps welded to <br />pipe shields, anchor bolts, nuts, and washers. <br />1 each <br />Thrust Support Bracket assembly at Pier 5, including fabricated <br />steel, drilled holes, epoxy resin, pipe straps welded to pipe <br />shields, anchor bolts, nuts, and washers. <br />1 each <br />October 2025