Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br />Water Main Replacement “Y” – Ph 2 Div B – BID ITEM DESCRIPTIONS <br />Work Order No. UP 3814 SP-26 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />Pipe strap assembly supporting vertical runs of pipe, not including <br />those at thrust support locations, but including drilled holes, epoxy <br />resin, pipe straps welded to pipe shields, anchor bolts, nuts, and <br />washers. <br />11 each <br />Note pipe straps welded to pipe shields at pipe strap assemblies supporting vertical runs of <br />pipe are larger than pipe straps at thrust support locations. See Plans. <br />The quantities are listed only for the convenience of the Contractor in determining the volume of <br />work involved and are not guaranteed to be accurate. The prospective bidders shall verify these <br />quantities before submitting a bid. No adjustments other than for accepted changes will be made <br />in the lump sum Contract price for “Utility Supports on Bridge 645W” even though the actual <br />quantities required may deviate from those listed. <br /> Class 52 Ductile Iron Pipe for Watermain, 12-Inch, Buried <br />Specification Section 7-09 <br />Measurement and Payment: Unit Price per Linear Foot (LF) <br />Per linear foot pipe measurement shall be based on the slope distance from point to point. The <br />point of beginning or ending of measurement in any particular run of pipe shall be the vertical <br />intersection of the centerline of the pipe measured with the centerline of the intersection pipe, or <br />with the beginning or ending of any new linear length of valves or couplings contained within the <br />measured length. At changes in pipe size connected by a reducer or a tee, the point of <br />measurement shall include the length of the reducer or the tee. <br />The unit contract price for Ductile Iron Pipe For Watermain, 12-Inch, shall constitute full <br />compensation for all labor, materials, tools and equipment necessary to furnish and install the pipe, <br />restrained joints (where shown on the Plans or as required by the Standard Specifications and <br />Special Provisions), and all fittings, including tees, crosses, reducers, couplings, and sleeves <br />required for complete installation along the run of each pipe size, as shown on the Plans and <br />specified herein, and additionally, shall include, but not be limited to, the following: <br />1.Removal of structures or obstructions not specifically covered under other Bid Items. This shall <br />include, but not be limited to, removal and disposal of the existing asphalt or concrete <br />pavement, sidewalk, curb, thrust blocks, miscellaneous landscaping, and sod as indicated on <br />the Plans. <br />2.Utility or light pole holding in conformance with the requirements of the applicable utility <br />including, if necessary, arranging for the utility to hold poles and paying the associated fees. <br />3.Trench excavation and dewatering, installation of pipe, furnishing, placing, and compacting <br />sand backfill for pipe bedding per Section 9-03.22, furnishing, placing, and compacting trench <br />backfill and placing and compacting imported backfill material. No extra payment shall be <br />made for removing, loading, hauling, and disposing of displaced and unsuitable material. <br />4.Maintenance, restoration, and/or relocation, if required, of existing culverts, storm drainage <br />pipe, other utilities and structures affected by construction that are to remain. <br />5.Temporary and permanent thrust blocking and dead man blocks, and temporary and <br />permanent restraint systems. <br />6.Ethafoam pads or sand backfill between watermain and other pipes. <br />7.Maintenance of existing watermain and provisions for interim water service. <br />8.Pressure and purity testing of all watermains and shall include providing temporary blow-offs, <br />backflow prevention, air gap apparatus, flushing, and disinfecting as necessary for testing in <br />accordance with 7-09.3(24) of these Special Provisions and COE Standard Drawing No. 526. <br />October 2025