Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br />Water Main Replacement “Y” – Ph 2 Div B – BID ITEM DESCRIPTIONS <br />Work Order No. UP 3814 SP-27 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />9.Abandonment of existing watermains as shown on the Plans, including cutting, draining water <br />and properly disposing, and plugging pipe at each end with a minimum of 2-feet of Commercial <br />concrete or CDF. Include the concrete or CDF work with this work with no direct compensation <br />being made. Abandon existing mains in place where possible. Include cost of removal, hauling, <br />and disposal of existing main with these Bid items when abandoning in place is not possible. <br />Include closing existing valves, and plugging where noted, to be abandoned and removing the <br />lids and valve boxes. <br />10.Work required to avoid unexpected or unforeseen obstacles shall be paid for under the Force <br />Account item. <br />Based on the unit price per lineal foot for Ductile Iron Pipe for Watermain, ___-inch, partial <br />payments will be made as follows: <br />•Upon pipe installation – 70% of bid price <br />•Upon successful testing and connection and service transfer – 25% of bid price <br />•Upon completion of permanent patch – 5% of bid price. <br /> Class 52 Ductile Iron Pipe for Watermain, 12-Inch Pre-insulated in 18-Inch Steel <br />Casing on Existing Bridge Structure <br />Specification Section 7-09 <br />Measurement and Payment: Unit Price per Linear Foot (LF) <br />Per linear foot pipe measurement shall be along the pipe centerline for the length of 12-Inch Pre- <br />insulated in w/ 18-Inch Steel Casing pipe installed. <br />The unit contract price for Ductile Iron Pipe For Watermain, 12-Inch Pre-insulated in 18-Inch Steel <br />Casing, on Existing Bridge Structure, shall constitute full compensation for all labor, materials, tools <br />and equipment necessary to furnish and install the pre-insulated pipe in casing, including joint <br />closure sleeves, required for complete the installation in accordance with the details and these <br />Special Provisions where indicated in the plans along on the underside of the existing bridge and <br />down the bridge structure column/abutment to the ground at each end. Additionally, shall include, <br />but not be limited to, the following: <br />1.Maintenance of existing watermain and provisions for interim water service. <br />2.Pressure and purity testing of all watermains and shall include providing temporary blow-offs, <br />backflow prevention, air gap apparatus, flushing, and disinfecting as necessary for testing in <br />accordance with 7-09.3(24) of these Special Provisions and COE Standard Drawing No. 526. <br />3.Work required to avoid unexpected or unforeseen obstacles shall be paid for under the Force <br />Account item. <br />Based on the unit price per lineal foot for Ductile Iron Pipe for Watermain, 12- Inch Pre-insulated in <br />18-Inch Steel Casing, on Existing Bridge Structure, partial payments will be made as follows: <br />•Upon pipe installation – 70% of bid price <br />•Upon successful testing and connection and service transfer – 30% of bid price <br />October 2025