My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 12/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction Inc. 12/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 10:39:10 AM
Creation date
12/17/2025 10:24:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/17/2025
Council Approval Date
12/10/2025
Department
Public Works
Department Project Manager
Amie Campbell
Subject / Project Title
Water Main Y, Phase 2
Tracking Number
0005048
Total Compensation
$2,020,202.02
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 1 – GEN REQUIREMENTS October 2025 <br />Work Order No. UP 3814 SP-50 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />Contractor agrees that the Contractor shall actively solicit the employment of minority <br />group members. Contractor further agrees that the Contractor shall actively solicit Bids <br />for the subcontracting of goods or services from qualified minority businesses. <br />Contractor shall furnish evidence of the Contractor's compliance with these <br />requirements of minority employment and solicitation. Contractor further agrees to <br />consider the grant of subcontracts to said minority bidders on the basis of substantially <br />equal proposals in the light most favorable to said minority businesses. The Contractor <br />shall be required to submit evidence of compliance with this section as part of the Bid <br />by submitting the RCW 35.22.650 Certification. <br />Revise the following words from the fifth paragraph of 1-02.6, which state with “The Bidder <br />shall submit with the Bid a list of:” to read as follows: If the “SUBCONTRACTORS FORM” is <br />included in the bid package, then the Bidder shall submit with their bid such <br />SUBCONTRACTORS FORM, which includes a list of:” <br />Delete the sixth paragraph of 1-02.6, which begins with “The Bidder shall submit with their <br />Bid a completed Contractor Certification Wage Law Compliance form (WSDOT Form 272- <br />009).” <br />Supplement 1-02.6 by adding the following: <br />In the event that the product of a unit price and an estimated quantity do not equal the <br />extended amount quoted, the unit price shall govern, and the correct product of the unit <br />price and the estimated quantity shall be deemed to be the amount bid. If the sum of two <br />or more items in a bidding schedule does not equal the total amounts quoted, the <br />individual item amounts shall govern and the correct total shall be deemed to be the <br />amount bid. Do not qualify Proposal, since this will automatically be cause for rejection <br />of the Proposal. <br />Bidders are warned against making erasures or alterations of any kind to the Proposal <br />Form, and proposals that contain omissions, erasures, or irregularities of any kind may <br />be rejected. No oral, electronic, fax, telegraphic, or telephonic proposals or modifications <br />will be considered. <br />1-02.7 Bid Deposit <br />Supplement 1-02.7 by adding the following: <br />Bid deposit shall serve as evidence of good faith and as a guarantee that if awarded the <br />Contract the Bidder will execute the Contract and provide bonds as required by the Bid. <br />Should the successful Bidder fail to enter into the Contract, furnish a satisfactory <br />performance and payment bond, and furnish evidence of insurance within 14 calendar <br />days after the Award Date, the certified check, cashier’s check or bid bond shall, unless <br />otherwise provided in the Contract Documents, be forfeited as liquidated damages. <br />Bid bonds shall contain the following: <br />1. City-assigned number for the Project; <br />2. Name of the Project; <br />3. The City of Everett named as obligee; <br />4. The amount of the bid bond stated either as a dollar figure or as a percentage <br />that represents five percent of the maximum bid amount that could be awarded; <br />5. Signature of the Bidder’s officer empowered to sign official statements. The <br />signature of the person authorized to submit the Bid should agree with the <br />signature on the bond, and the title of the person must accompany the said <br />signature;
The URL can be used to link to this page
Your browser does not support the video tag.