My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 12/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction Inc. 12/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 10:39:10 AM
Creation date
12/17/2025 10:24:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/17/2025
Council Approval Date
12/10/2025
Department
Public Works
Department Project Manager
Amie Campbell
Subject / Project Title
Water Main Y, Phase 2
Tracking Number
0005048
Total Compensation
$2,020,202.02
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 1 – GEN REQUIREMENTS October 2025 <br />Work Order No. UP 3814 SP-57 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />Representative the description upon which the Contractor relied in preparing <br />its Bid or laying out the Work. <br />1-04.1(3)D Utilities <br />1-04.1(3)D(1) General <br />The City has endeavored to determine the existence of public and private <br />utilities at the site of the Work from the records of the owners of known utilities <br />in the vicinity of the Work. The positions of these utilities as derived from such <br />records are shown on the Plans. The service connections to the gas, electric, <br />cable TV and communication utilities are not shown on the Plans. Refer to 1- <br />07.17 UTILITIES AND SIMILAR FACILITIES regarding Contractor’s <br />responsibility for locating and verifying underground public and private utilities. <br />1-04.1(3)D(2) Unknown/Incorrectly Marked Utilities <br />When a utility interferes with the Work and is either (1) not identified on the <br />Plans or (2) located in a position significantly different from that specified on <br />the Plans or in accordance with a particular utility’s standard depth and location, <br />Contractor shall follow the procedures of 1-04.7 DIFFERING SITE <br />CONDITIONS (CHANGED CONDITIONS). Interference with the Work is <br />defined as a utility that crosses or projects into the plane of the Work at an <br />elevation between the top and bottom of the Work. <br />1-04.2 Coordination of Contract Documents, Plans, Special Provisions <br />Specifications, and Addenda <br />Revise the first and second paragraphs of 1-04.2 to read as follows: <br />The complete Contract includes Division C – CONTRACT, Division P – PROPOSAL, <br />Division B – BID ITEM DESCRIPTIONS, Special Provisions, Contract Plans, Standard <br />Specifications, Standard Plans in effect as of the date Bids are opened, Addenda, <br />supplemental agreements, change orders, certifications and affidavits required by this <br />Contract and by law, and Federal requirements that apply to this Contract and Project. <br />These parts complement each other in describing a complete Work. Any requirement in <br />one part binds as if stated in all parts. The Contractor shall provide any Work or materials <br />clearly implied in the Contract even if the Contract does not mention it specifically. <br />Any inconsistency in the parts of the Contract shall be resolved by following this order <br />of precedence: <br />1. Change Orders, <br />2. Addenda, <br />3. Division C – CONTRACT, <br />4. Division P – PROPOSAL, <br />5. Division B – BID ITEM DESCRIPTIONS <br />6. Special Provisions, <br />7. Contract Plans, <br />8. City’s Standard Drawings (if any) <br />9. WSDOT/APWA Standard Specifications for Road, Bridge, and Municipal <br />Construction, <br />10. WSDOT/APWA Standard Plans for Road, Bridge and Municipal Construction.
The URL can be used to link to this page
Your browser does not support the video tag.