My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD 2024 BLDG 40-26 Plans 2026-01-02
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-26
>
Plans
>
3003 W CASINO RD 2024 BLDG 40-26 Plans 2026-01-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2026 11:35:36 AM
Creation date
1/2/2026 11:34:29 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-26
Permit
M2403-064
Year
2024
Notes
Compressed Air and Hydronic systems
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LEGEND <br /> MATCH LINE - DWG 40-26-TNM111-13 <br /> - - - - - - - - - - - - - - - - - - - - v GENERAL NOTES <br /> 1. COMPRESSED AIR PIPE MATERIAL: BLACK STEEL, <br /> SCHEDULE 40, ASTM A 53, GRADE B WITH <br /> ❑ CLASS 150 MALLEABLE IRON THREADED <br /> s FITTINGS ASTM 197/ASTM B16.3 <br /> 2. BALL VALVES: BRONZE BODY, CHROME PLATED <br /> BALL, FULL PORT, REINFORCED PTFE SEATS <br /> AND PACKING, THREADED ENDS, 600 PSI WOG, <br /> 2 B WATTS B-6400 OR OTHER APPROVED. <br /> 3. SELF-EXHAUSTING BALL VALVE: APOLLO <br /> 7K-100-SV OR OTHER APPROVED. <br /> > ❑ <br /> a <br /> ° A(3) <br /> B CONSTRUCTION NOTES <br /> 1�PROVIDE COMPRESSED AIR AND CONNECT TO <br /> EXISTING MAIN. <br /> (2)1'A QUICK-DI CONNECT COUPLINGS: HANSEN > O , <br /> 4 (2)1 z'A #B12-H46i. SAFETY CHECK VALVE: DIXON 2 1 A <br /> M550 MODEL SC M-12 ❑ j (2)1z"A 2�PROVIDE CAP.M550 <br /> I - 2H2 2H1 2H16 - 1H9 1H8 1 > <br /> 4"A A 4 A - A A A 4 4"A A 4"A A 4"A <br /> z <br /> N8 T7N8 I <br /> N <br /> I <br /> '1HI W2a <br /> (2)1"A <br /> o (2)12"A (2)1 i"A U o <br /> I <br /> M`50 M`5�0 ¢ <br /> < 4"A A A A 4"A <br /> QUICK-DIS ONNECT COUPLINGS: HANSEN ¢ <br /> #B12-H46. SAFETY CHECK VALVE: DIXON > ¢ <br /> = MODEL SCV -12. <br /> U131,1118 U M503 <br /> ¢ ❑ D <br /> 1 <br /> D <br /> 2 B <br /> D <br /> d <br /> N ° <br /> D 112"VALVEWIPLUG <br /> 112"PLUGGED TEE <br /> — — — 1 T <br /> TD <br /> 70.9MATCH LINE - DWG 40-26-TNM111-23 7—A A A A T - <br /> 10 G 40 026 <br /> N <br /> 11 12 13 14 0 <br /> N.3 <br /> 15 16 17 18 19 <br /> N. C7 <br /> 20 21 22 23 24 <br /> m <br /> PARTIAL PLAN KI 25 26 27 28 29 III P <br /> SCALE: 1/8"-1'-O" R <br /> KEY PLAN BLDG. 40-26 O <br /> SCALE: NONE <br /> pk� <br /> ISSUED FOR CONSTRUCTION 8' 4' 0 4' 8' 16, <br /> PROFESSIONAL STAMP & SIGNATURE EERS SCALE: 1/8"FI <br /> APPLIES TO WORK WITHIN THE CLOUDED Seattle//Spokane//Baltimore DESIGN BY FSI DATE 01.04.24 <br /> REVISION AREAS ONLY AS INDICATED <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE ACCEPTABILITY DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE <br /> ",qo THIS DESIGN AND OR H K PARTIAL COMPRESSED AIR PLAN-TUNNEL W8861360 B 01.04.24 <br /> A TOOLING SYSTEMS WBS2523X-RECORD WBS2523X BRPH FSI 09.13.17 hpc ''� SPECIFICATION IS APPROVED SHEET <br /> B 737 NORTH LINE-40-026 WING SYSTEM INTEGRATION W8861360 PSI KMC 01.04.24BOE/A/G® " APPROVED BY DEPT. DATE ENGINEER TITLE 737 NORTH LINE - 40-26 WING SYSTEMS INTEGRATION TN M 111 18 <br /> CHECKED <br /> 1NA BUILDING 40-026 JOB NO COMP NO. <br /> fss/oNnl EN�� APPROVED WBS2523X <br /> APPROVED MECHANICAL MASTER COL. N.3-N.7/7-9 EVERETT, WA DWG NO. 40-026-TNM111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.