My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD 2024 BLDG 40-26 Plans 2026-01-02 (3)
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-26
>
Plans
>
3003 W CASINO RD 2024 BLDG 40-26 Plans 2026-01-02 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2026 12:03:14 PM
Creation date
1/2/2026 12:00:02 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-26
Permit
M2407-044
Year
2024
Notes
Waste Water System and Process Water System Tank Cleanout
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LEGEND <br /> BRONZE STRAINER BALL VALVE TEST COCK(TYR) <br /> GAGE VALVES,OR BALL VALVES <br /> MP FLASH <br /> STEAM LINE <br /> SPACE THERMOSTAT CONTROL VALVE <br /> 3/4"TO 2"OUTLET MAX. PD=10PS1 <br /> 2., �SPARE 1"INLET - � STRAINER(TYR) <br /> GATE VALVE(TYR) GENERAL NOTES <br /> I <br /> SUPPLY 3/4"TO 2" 3 (N <br /> BACKFLOW PREVENTER, P') I <br /> I I <br /> 6" 12"MIN. 6" 6" 6" <br /> WATTS 909 SERIES OR -- ---- ------------------ ---- <br /> AIR GAP EQUAL MPS (SEE PLAN FOR SIZE) <br /> PIPE TO FLOOR DRAIN RUN PIPING FULL CONNECTION <br /> SIZE FROM MAINS TO UNIT <br /> 2 1/2"(TYP.) - 12" MIN <br /> 3 3/4" <br /> 1.TO BE INSTALLED IN A CONTINUOUS PRESSURE WATER SUPPLY. 12" IF�T�ti <br /> 2. CAN BE INSTALLED HORIZONTALLY OR VERTICALLY. F&T TRAP <br /> 3.WATER SPILLAGE WILL LIKELY OCCUR.AN AIR GAP WITH DRAIN 1 1/2"DRAIN WITH CAP 1 DIRT LEG CHECK VALVE <br /> LINE MAY BE INSTALLED AS REQUIRED. IN A VERTICAL INSTALLATION <br /> AN ELBOW IS ALSO NECESSARY AND FLOW MUST BE"UP". IF-al TO EXISTING CONDENSATE UNIT HEATER (VERTICAL SHOWN, <br /> 4. DESIGNED TO BE INSTALLED AT CROSS CONNECTIONS SUBJECT RELIEVER AND PUMP APPLIES FOR HORIZONTAL AS WELL) <br /> TO HIGH HAZARD BACK PRESSURE OR BACK SIPHONAGE. <br /> 5.VERY HIGH PRESSURE DROP. 6 <br /> GRAVITY FLOW CONDENSATE <br /> 6.ACCESS&CLEARANCE SHALL BE PROVIDED FOR REQUIRED RETURN (SEE PLAN FOR SIZE) <br /> TESTING, MAINTENANCE,&REPAIR: INCLUDING A MINIMUM OF 1'-0" <br /> BETWEEN LOWEST PORTION OF ASSEMBLY,AND FLOOR OF PLATFORM. FLASH TANK MADE FROM 8"DIAMETER SCHEDULE 80 PIPE WITH <br /> ASSEMBLIES INSTALLED MORE THAN 5'-0"ABOVE FLOOR SHALL BE SCHEDULE 80 END CAPS WELDED TO PIPE. <br /> PROVIDED WITH A PERMANENT PLATFORM CAPABLE OF SUPPORTING A TANK LENGTH TO BE MINIMUM OF 36 INCHES. <br /> TESTER OR MAINTENANCE PERSON. PROVIDE AT LEAST ONE 1"DIAMETER SPARE CAPPED INLET. NOTE: ISOLATING VALVE MUST PROTECT G ��`` <br /> INLETS SIZED TO MATCH CONDENSATE LINES. COMPLETE STEAM TRAP ASSEMBLY. CONSTRUCTION NOTES <br /> ALL TANK NOZZLES TO BE SCHEDULE 80 PIPE. <br /> INSULATE FLASH TANK. PROVIDE NEW LABEL TO EXISTING PIPE AS <br /> REDUCED PRESSURE PRINCIPLE "PUMPED PROCESS COLD WATER" (PPCW). <br /> BACKFLOW PREVENTER DETAIL TYPICAL FLASH TANK DETAIL UNIT HEATER CONNECTION DETAIL <br /> SCALE: NONE M454 M567 SCALE: NONE M454 M567 SCALE: NONE M454 M567 <br /> 3/4"0 THREADED ROD <br /> PUMPED PROCESS ° W/ HILTI-RE 500 <br /> COLD WATER SO ADHESIVE 5" MIN <br /> 3"PPCW C _ EMBED (TYR) <br /> 3"PPCW C <br /> REFERENCED DRAWINGS <br /> B WALL---' 3" HEAVY DUTY SINGLE PIPE CLAMP <br /> 3A 8088.9 PIPDER DPAL-AS U W15DUEB K. <br /> SECTION <br /> GATE VALVE (TYR) <br /> BP STRAINER <br /> COLD WATER 3" 3B 3"PPCW UNION (TYR) ° <br /> 3"CW RPBFP n' n' v a' 1/4"CS INVERTED BUCKET TRAP(HIGH PRESSURE) _ <br /> 3/8"INVERTED BUCKET TRAP(MEDIUM PRESSURE) <br /> �+ T DRIP TRAPS SHALL BE LOCATED: _ <br /> 12"MIN — 1.AT THE END OF STEAM MAINS <br /> HT 2.ANY CHANGE OF ELEVATION OF <br /> 1 6"DIRT LEG STEAM PIPE - <br /> FULL SIZE OF .WHERE INDICATED ON DRAWING C �3"PPCW <br /> MAIN STEAM PIPE <br /> CHECK VALVE 3 <br /> WALL <br /> HIGH PRESSURE CONDENSATE TO FLASH TANK, P LAN <br /> MEDIUM PRESSURE CONDENSATE TO CONDENSATE <br /> RECEIVER AND PUMP <br /> BOOSTER PUMP PIPING CONNECTION DETAIL M567 M454 M567 DRIP E M45RAP DETAIL PIPE DANCHOR DETAIL o SCALE: GM116 M567 <br /> F <br /> ISSUED FOR CONSTRUCTION <br /> PROFESSIONAL STAMP & SIGNATURE NEERS a <br /> APPLIES TO WORK WITHIN THE CLOUDED Seattle//Spokane//Baltimore DESIGN BY FSi DATE 03.14.24 <br /> REVISION AREAS ONLY AS INDICATED <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE LR_K DATE SUBTITLE CURRENT REVISION SYMBOL DATE <br /> M. CH,q ACCEPTABILITY D.VU 05.30.06 HVAC DETAILS W8861360 G 03.14.24 <br /> ORIG 787 FA RECORD SET 555886 WH C. LARSON 06,22.07 for THIS DESIGN AND/OR CHECKED \ <br /> tiP SPECIFICATION IS APPROVED C. LARSON 05.30.06 SHEET <br /> A 787 SURGE LINE WH SAG 10.15.12 L W APPROVED By DEPT. DATE D.VU 05.30.06 TITLE 737 NORTH LINE - 40-26 WING TANK CLEANOUT M 567 <br /> B AQUEOUS WASH POS 3 WBS 252 JAL FSG 12.19.18 CHECKED x C. LARSON 05.30.06 BUILDING 40-026 <br /> APPROVED JOB NO, COMP N0. <br /> C 737 NORTH LINE- 40-26 WING TANK CLEANOUT W8861360 FSi KMC 03.14.24 SS/ONAL ENG J.JENKINS 05.30.06 <br /> APPROVED MECHANICAL MASTER EVERETT, WA Dwc N0. 40-026-M567 <br />
The URL can be used to link to this page
Your browser does not support the video tag.