My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jacobs Engineering Group, Inc. 1/23/2026
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Jacobs Engineering Group, Inc. 1/23/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2026 4:00:16 PM
Creation date
1/23/2026 3:58:03 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jacobs Engineering Group, Inc.
Approval Date
1/23/2026
Council Approval Date
12/17/2025
End Date
12/31/2028
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
41st Street to Rucker Avenue Corridor Phase 2
Tracking Number
0005085
Total Compensation
$2,649,646.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Exhibit A (Scope of Work) <br />• All geotechnical borings conducted through the pavement and pavement cores <br />will be patched with quick drying cement or hot mix asphalt as to replace the <br />existing condition in kind. Saw cutting of the pavement will not be required. <br />• The borehole and coring locations will be surveyed as part of the survey and <br />mapping task. <br />• The site soils will support standard plan signal pole and luminaire foundations <br />design. No non-standard signal pole or foundation design will be required. <br />• City will provide as-builts on existing pavement sections and pavement treatment <br />history. <br />• As-built review of existing pavement will be performed in a limited capacity as needed <br />to inform FWD testing <br />• City will provide consultant required pavement design life. <br />• City will provide any current or future bus routes that may operate on these project <br />sites. <br />• An alternative’s analysis will not be performed for the scope of this work (i.e. Life Cycle <br />Cost Analysis). <br />• Design of pavement is only for full depth reconstruction. Evaluation of W Marine View <br />Drive will be performed to inform areas of pavement preservation and recommend <br />locations of rehabilitation. <br />Deliverables: <br />• Draft and Final Pavement Design Memorandum <br />• Draft and Final Geotechnical Engineering Report <br />• Development of Geotechnical Project Specifications
The URL can be used to link to this page
Your browser does not support the video tag.