Laserfiche WebLink
Exhibit A (Scope of Work) <br />• All geotechnical borings conducted through the pavement and pavement cores <br />will be patched with quick drying cement or hot mix asphalt as to replace the <br />existing condition in kind. Saw cutting of the pavement will not be required. <br />• The borehole and coring locations will be surveyed as part of the survey and <br />mapping task. <br />• The site soils will support standard plan signal pole and luminaire foundations <br />design. No non-standard signal pole or foundation design will be required. <br />• City will provide as-builts on existing pavement sections and pavement treatment <br />history. <br />• As-built review of existing pavement will be performed in a limited capacity as needed <br />to inform FWD testing <br />• City will provide consultant required pavement design life. <br />• City will provide any current or future bus routes that may operate on these project <br />sites. <br />• An alternative’s analysis will not be performed for the scope of this work (i.e. Life Cycle <br />Cost Analysis). <br />• Design of pavement is only for full depth reconstruction. Evaluation of W Marine View <br />Drive will be performed to inform areas of pavement preservation and recommend <br />locations of rehabilitation. <br />Deliverables: <br />• Draft and Final Pavement Design Memorandum <br />• Draft and Final Geotechnical Engineering Report <br />• Development of Geotechnical Project Specifications