My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jacobs Engineering Group, Inc. 1/23/2026
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Jacobs Engineering Group, Inc. 1/23/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2026 4:00:16 PM
Creation date
1/23/2026 3:58:03 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jacobs Engineering Group, Inc.
Approval Date
1/23/2026
Council Approval Date
12/17/2025
End Date
12/31/2028
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
41st Street to Rucker Avenue Corridor Phase 2
Tracking Number
0005085
Total Compensation
$2,649,646.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Exhibit A (Scope of Work) <br />Task 6 – Civil and Roadway Design <br />This task provides civil engineering design of proposed roadway improvements. This <br />includes the development of the roadway design, including the horizontal and vertical <br />alignment, curb and gutter, intersection layout, sidewalk layout, curb ramp layout, <br />grading, driveway profiles, typical roadway sections, site preparation, and <br />channelization. <br />Alternatives Analysis for West Marine View Dr/Pacific Ave <br />Intersection <br />Consultant will perform alternatives analysis on Concept 2A.2 (west shift) and Concept <br />2B.2 (east shift) to determine the preferred concept alignment for the West Marine View <br />Dr/Pacific Ave intersection. The alternative analysis will be performed at the 30% design <br />milestone, once historic property review has been completed on adjacent parcels. <br />Consultant will provide a summary table for alternative comparison of impacts between <br />concepts. Consultant will hold up to one (1) meeting with City staff to present alternative <br />comparison and make selection of the preferred concept to advance into final design for <br />the project. <br />Deliverables: <br />• Technical memorandum summarizing alternatives for comparison <br />Civil and Roadway Design <br />Project roadway improvements include the four following intersections: <br />• Terminal Ave/West Marine View Dr/Everett Ave (SR 529) <br />• West Marine View Dr/Pacific Ave <br />• Pacific Ave/Grand Ave <br />• Rucker Ave/41st St <br />In addition, pavement rehabilitation is planned along W. Marine View Drive between <br />Pacific Avenue and Terminal Avenue. This includes upgrade of the curb ramps to meet <br />current ADA standards at the following intersections: <br />• Terminal Ave/West Marine View Dr/Everett Ave (SR 529) <br />• Hewitt Avenue/West Marine View Dr <br />• Wall Street/West Marine View Dr <br />• Pacific Avenue/West Marine View Dr <br />• California Street/West Marine View Dr <br />• 41st Street/Colby Avenue
The URL can be used to link to this page
Your browser does not support the video tag.