My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jacobs Engineering Group, Inc. 1/23/2026
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Jacobs Engineering Group, Inc. 1/23/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2026 4:00:16 PM
Creation date
1/23/2026 3:58:03 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jacobs Engineering Group, Inc.
Approval Date
1/23/2026
Council Approval Date
12/17/2025
End Date
12/31/2028
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
41st Street to Rucker Avenue Corridor Phase 2
Tracking Number
0005085
Total Compensation
$2,649,646.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Exhibit A (Scope of Work) <br />• Remove existing traffic signal pole, mast arm, push button pole, and associated <br />equipment on the SWC and SEC based on new curb return, curb ramp, and <br />sidewalk <br />• Install up to two (2) pedestal (or push button) poles on the SWC and SEC based <br />on new curb return, curb ramp, and sidewalk <br />• Install up to one (1) traffic signal pole on the SWC and SEC based on new curb <br />return, curb ramp, and sidewalk <br />• Modify/install signal existing pull boxes, conduit, and associated traffic signal <br />equipment to accommodate the conversion of the intersection to a pedestrian <br />signal <br />Rucker Ave & 41st St <br />• Remove existing traffic signal equipment on the NEC <br />• Install up to two (2) pedestal (or push button) poles on the NEC based on new <br />curb return, curb ramp, and sidewalk <br />• Install up to one (1) traffic signal pole on the NEC based on new curb return, curb <br />ramp, and sidewalk <br />• Modify/install existing pull boxes, conduit, and associated traffic signal equipment <br />41st St & Colby Ave <br />• Remove existing traffic signal equipment on the NEC and SEC <br />• Remove existing traffic signal pole on SWC <br />• Install up to one (1) pedestal (or push button) pole and up to one (1) traffic signal <br />pole on the NEC based on new curb return, curb ramp, and sidewalk <br />• Install up to one (1) pedestal (or push button) pole and up to one (1) traffic signal <br />pole on the SEC based on new curb return, curb ramp, and sidewalk <br />• Install up to one (1) traffic signal pole on the SWC based on new curb return, <br />curb ramp, and sidewalk <br />• Modify/install existing pull boxes, conduit, and associated traffic signal equipment <br />W Marine View Dr & California St <br />• Remove existing traffic signal equipment on the NEC and SWC <br />• Install up to one (1) pedestal (or push button) pole on the NEC based on new <br />curb return, curb ramp, and sidewalk <br />• Install up to one (1) pedestal (or push button) pole and up to one (1) traffic signal <br />pole on the SWC based on new curb return, curb ramp, and sidewalk <br />• Modify/install existing pull boxes, conduit, and associated traffic signal equipment
The URL can be used to link to this page
Your browser does not support the video tag.