My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jacobs Engineering Group, Inc. 1/23/2026
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Jacobs Engineering Group, Inc. 1/23/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2026 4:00:16 PM
Creation date
1/23/2026 3:58:03 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jacobs Engineering Group, Inc.
Approval Date
1/23/2026
Council Approval Date
12/17/2025
End Date
12/31/2028
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
41st Street to Rucker Avenue Corridor Phase 2
Tracking Number
0005085
Total Compensation
$2,649,646.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Exhibit A (Scope of Work) <br />them would cause significant changes to the plans, this may be considered <br />additional work to be included in a supplement. <br />• The City will be responsible for project advertisement and document control. <br />• Preparation of a basis of design or design report for the project is not included in <br />this scope of services. <br />• In providing opinions of cost and schedules for the project, Consultant has no <br />control over cost or price of labor and materials; competitive bidding procedures <br />and market conditions; time or quality of performance by operating personnel or <br />third parties; and other economic and operational factors that may materially <br />affect the ultimate project cost or schedule. Therefore, the Consultant makes no <br />warranty that the City’s actual project costs or schedules will not vary from <br />Consultant’s opinions, analyses, projections, or estimates. <br />Deliverables: <br />• Responses to 100% comments <br />• Ad-ready plans (signed, PDF) <br />• Final opinion of cost summary (Excel) <br />• Ad-ready specifications (run-list and individual specifications files, Word) <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.