My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jacobs Engineering Group, Inc. 1/23/2026
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Jacobs Engineering Group, Inc. 1/23/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2026 4:00:16 PM
Creation date
1/23/2026 3:58:03 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jacobs Engineering Group, Inc.
Approval Date
1/23/2026
Council Approval Date
12/17/2025
End Date
12/31/2028
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
41st Street to Rucker Avenue Corridor Phase 2
Tracking Number
0005085
Total Compensation
$2,649,646.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Exhibit A (Scope of Work) <br />analysis (including affected stakeholders and organizations), key messages, and <br />engagement timelines. <br />As an appendix to the community outreach plan, the consultant will develop a <br />socioeconomic and community analysis plan that will capture project area demographic <br />research and leverage previous outreach efforts for the Project to inform strategies for <br />engaging historically underrepresented and limited-English speaking populations. <br />Assumptions: <br />• Two rounds of client review for initial draft of the community outreach plan. One <br />update can be made, if needed, as the project advances through design. <br />• One round of review for the draft of the socioeconomic and community analysis <br />plan. <br />• <br />• Consultant will leverage and build off deliverables from prior engagement and <br />planning. This includes the affected stakeholders list and key messages. <br />Deliverables: <br />• Community outreach plan (1) with up to 1 update <br />• Socioeconomic and community analysis plan (1) <br />Stakeholder engagement <br />Based on information gathered for the Project, Consultant will support the City in using <br />already identified communication methods for how the community would like to stay <br />informed and engaged during the project. Consultant, in coordination with the City, will <br />support stakeholder engagement, which may include neighborhood forums, agency <br />meetings, and one on one briefings with potentially affected property owners and <br />stakeholders. <br />Assumptions: <br />• Project overview briefing deck templates will be developed for design and final <br />design. City is responsible for tailoring deck templates for audience. <br />• City will be responsible for scheduling meetings. <br />• City will lead and facilitate meetings. One consultant staff may attend to support <br />and take notes. <br />• Consultant will set up virtual stakeholder meetings via Teams. <br />• Agency meetings will be led by the City. <br />• ROW meetings will be led by the ROW team and the City. <br />Deliverables:
The URL can be used to link to this page
Your browser does not support the video tag.