My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jacobs Engineering Group, Inc. 1/23/2026
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Jacobs Engineering Group, Inc. 1/23/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2026 4:00:16 PM
Creation date
1/23/2026 3:58:03 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jacobs Engineering Group, Inc.
Approval Date
1/23/2026
Council Approval Date
12/17/2025
End Date
12/31/2028
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
41st Street to Rucker Avenue Corridor Phase 2
Tracking Number
0005085
Total Compensation
$2,649,646.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Exhibit A (Scope of Work) <br />• Project overview briefing deck templates (up to 2) <br />• Meeting materials (template briefing deck, see above) and summary for <br />neighborhood forums (1) <br />Public information and outreach materials <br />The consultant, in coordination with the City, will develop materials, online content and <br />graphics to support all community engagement and communication efforts. Public <br />information materials may include factsheets, website updates, public-facing maps and <br />drawings, online newsletters, social media posts, and mailings. Products will be <br />developed at key project milestones through design and communicate construction <br />impacts. <br />Assumptions: <br />• Project graphics includes a project corridor map and public-friendly drawings at <br />design and final design. <br />• City will be responsible for the translation of materials. <br />• Consultant will support content development for major website updates. City will <br />be responsible for minor updates. <br />• Consultant will be responsible for printing and postage costs of mailings. City will <br />be responsible for providing mailing address lists. <br />• Consultant will update and maintain the existing project FAQ, with up to 1 <br />update. This document is intended to remain an internal resource for project <br />staff. <br />• Consultant will develop the initial templates for these materials and provide minor <br />updates at each project milestone. <br />• The consultant will prepare materials (outlined above; FAQs, talking points, etc.) <br />to assist community briefings. However, the consultant will not prepare materials <br />specific to any briefing. <br />Deliverables: <br />• Project milestone key messages for public-facing announcements 1) <br />• Website updates (1) <br />• Project factsheets (1) <br />• Stakeholder email templates (1) <br />• Project graphics (up to 3) <br />• Project FAQ (1) with 1update
The URL can be used to link to this page
Your browser does not support the video tag.