My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jacobs Engineering Group, Inc. 1/23/2026
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Jacobs Engineering Group, Inc. 1/23/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2026 4:00:16 PM
Creation date
1/23/2026 3:58:03 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jacobs Engineering Group, Inc.
Approval Date
1/23/2026
Council Approval Date
12/17/2025
End Date
12/31/2028
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
41st Street to Rucker Avenue Corridor Phase 2
Tracking Number
0005085
Total Compensation
$2,649,646.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Exhibit A (Scope of Work) <br />• Project area postcard (1) <br />• Public correspondence log (1) <br />Fieldwork, pre-acquisition, and right-of-entry coordination <br />for pre-construction <br />The consultant will support communication needs for geotechnical borings, surveys, <br />environmental investigations, or other fieldwork activities, as requested. <br />Assumptions: <br />• The consultant will develop one fieldwork notification template and update it for <br />specific fieldwork activities and locations. <br />• City will be responsible for any translation, or in-person interpretation needs. <br />• Consultant will be responsible for printing flyers. <br />• Up to two consultant staff will deliver door-to-door notifications, as requested. For <br />safety, no less than two individuals will conduct door-to-door outreach. <br />Deliverables: <br />• Fieldwork notification flyer template for business and residences (1) <br />Outreach summaries <br />Consultant will prepare an outreach summary report following large project milestones <br />that involved substantial public involvement, as needed. The summaries will include the <br />outreach approach and methods used, what we heard from stakeholders and the <br />community, how feedback influenced the solutions. <br />Assumptions: <br />• One summary will be produced after the design phase. <br />• Each summary will include two rounds of client review. <br />Deliverables: <br />• Outreach summaries (1) <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.