My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, Inc. 2/4/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, Inc. 2/4/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2026 11:26:52 AM
Creation date
2/4/2026 11:05:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, Inc.
Approval Date
2/4/2026
Council Approval Date
1/28/2026
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Lenora Regional Stormwater Facility
Public Works WO Number
UP3792
Tracking Number
0005101
Total Compensation
$5,905,272.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
781
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Lenora Regional SW Facility Division P – Proposal Nov. 2025 <br />Work Order # UP3792 SP - xliv <br />Category 2: For official use only / disclosure permissible by law. <br />Measurement and Payment: Square Foot (SF) <br />Measurements shall meet the requirements of 1-09.1. This unit price bid item includes all costs <br />associated with fabrication, installation, maintaining and removal of the signs. <br /> Type II or Type III Barricade <br />Measurement and Payment: Each (EA) <br />Measurements shall meet the requirements of 1-09.1. This unit price bid item includes all costs <br />associated with furnishing, installation, maintaining and removal of the barricades. <br /> Clearing and Grubbing <br />Measurement and Payment: Square Yard (SY) <br />Measurements shall meet the requirements of 1-09.1. This unit price bid item includes all costs <br />associated with clearing and grubbing, except roadside clean-up. For this project clearing and grubbing <br />shall include tree removals and per section 2-01.3 in the WSDOT Standards Specifications and shall <br />not be paid per each. Removal of stumps and roots, including backfilling the void spaces is considered <br />incidental to Clearing and Grubbing and no separate payment will be made. Roadside clean-up shall <br />be considered incidental to the project work and no separate payment will be made. <br /> Protect Existing Tree <br />Measurement and Payment: Each (EA) <br />Measurements shall meet the requirements of 1-09.1. The unit contract price shall be full payment for <br />all materials, labor and equipment to furnish, install, maintain, and remove and dispose of temporary <br />tree protection devices. Placement and removal of 10-inches of wood chip bedding over the roots as <br />described in this section. Payment for the silt fence for tree protection is in accordance with Section 8- <br />01.5.and will be paid for under a separate bid item. furnish, install, maintain, remove, and dispose of <br />the temporary tree protection devices. <br /> Remove, Salvage, and Deliver Conc. Barriers <br />Measurement and Payment: Each (EA) <br />Measurements shall meet the requirements of 1-09.1. This unit price bid item includes all costs <br />associated with removal, salvage and delivery of concrete jersey barriers to the site designated by the <br />City as indicated on the Plans and as described in 2-02 of the project special provisions. <br />Removal of structures and obstructions not specifically listed as a separate pay item is considered <br />incidental to the project and no additional payment will be made. <br /> Remove Existing Curb and Gutter <br />Measurement and Payment: Linear Foot (LF) <br />Measurement shall be per linear foot as measured along the curb face (LF) Measurements shall meet <br />the requirements of 1-09.1. This unit price bid item includes all costs associated with removal and <br />disposal. <br /> Remove Cement Concrete Sidewalk and Driveway
The URL can be used to link to this page
Your browser does not support the video tag.