My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, Inc. 2/4/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, Inc. 2/4/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2026 11:26:52 AM
Creation date
2/4/2026 11:05:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, Inc.
Approval Date
2/4/2026
Council Approval Date
1/28/2026
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Lenora Regional Stormwater Facility
Public Works WO Number
UP3792
Tracking Number
0005101
Total Compensation
$5,905,272.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
781
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Lenora Regional SW Facility Division P – Proposal Nov. 2025 <br />Work Order # UP3792 SP - xlv <br />Category 2: For official use only / disclosure permissible by law. <br />Measurement and Payment: Square Yard (SY) <br />Measurements shall meet the requirements of 1-09.1. This unit price bid item includes all costs <br />associated with removal and disposal. Removal of existing concrete pedestrian ramps and removal of <br />existing stairs is included with this bid item and no separate payment will be made. <br /> Remove Manhole or Catch Basin <br />Measurement and Payment: Each (EA) <br />Measurement shall be per each (EA) Measurements shall meet the requirements of 1-09.1. This unit <br />price bid item includes all costs associated with removal, and disposal. <br />Costs associated with the removal and disposal, or abandonment of drainage structures and pipe not <br />specifically described on the Plans or listed within the specifications, but necessary to complete <br />removal of existing and/or the installation of new pipes and facilities shall be incidental to the project <br />and no separate payment will be made. <br /> Remove Existing 8 In. To 12 In. Dia. Pipe <br />Measurement and Payment: Linear Foot (LF) <br />Measurement shall be per linear foot as measured along the invert of the pipe (LF) Measurements <br />shall meet the requirements of 1-09.1. This unit price bid item includes all costs associated with <br />sawcutting removal, and disposal. <br />Costs associated with the removal and disposal or abandonment of drainage structures and pipe not <br />specifically described on the Plans or listed within the specifications, but necessary to complete <br />removal of existing and/or the installation of new pipes and facilities shall be incidental to the project <br />and no separate payment will be made. <br /> Remove Existing >12 In. To <30 In. Dia. Pipe <br />Measurement and Payment: Linear Foot (LF) <br />Measurement shall be per linear foot as measured along the invert of the pipe (LF) Measurements shall <br />meet the requirements of 1-09.1. This unit price bid item includes all costs associated with sawcutting <br />removal, and disposal. <br />Costs associated with the removal and disposal or abandonment of drainage structures and pipe not <br />specifically described on the Plans or listed within the specifications, but necessary to complete removal <br />of existing and/or the installation of new pipes and facilities shall be incidental to the project and no <br />separate payment will be made. <br /> Plug and Abandon Existing 12 In. To 18 In. Dia. Pipe <br />Measurement and Payment: Linear Foot (LF) <br />Measurement shall be per linear foot as measured along the invert of the pipe (LF) Measurements shall <br />meet the requirements of 1-09.1. This unit price bid item includes all costs associated with sawcutting <br />plugging the ends and filling the abandoned section in place with CDF as specified in 2-02.3(5) and 2- <br />09.3(1)E.
The URL can be used to link to this page
Your browser does not support the video tag.