Search
KLB Construction, Inc. 2/4/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, Inc. 2/4/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2026 11:26:52 AM
Creation date
2/4/2026 11:05:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, Inc.
Approval Date
2/4/2026
Council Approval Date
1/28/2026
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Lenora Regional Stormwater Facility
Public Works WO Number
UP3792
Tracking Number
0005101
Total Compensation
$5,905,272.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
781
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Lenora Regional SW Facility Division P – Proposal Nov. 2025 <br />Work Order # UP3792 SP - liv <br />Category 2: For official use only / disclosure permissible by law. <br />12. Trench excavation bedding and backfill will be paid for under other bid items and are not included <br />in this Work. <br />Partial Payments will be made for the per linear foot pipe contract price as follows: <br />1. A total of 15% of the total bid cost will be made based upon required material submittal and <br />acceptance and procurement of the pipe. Payment will be prorated on a per LF basis of pipe <br />procured to the total pipe quantity. <br />2. A total of 25% of the total bid cost will be made for delivery to the project or approved staging <br />and storage area, inspection and acceptance of the pipes, and inspection and approval of the <br />material storage method and location, by the Engineer. <br />3. The remainder of the payment will be made per linear foot of installed pipe for completion of <br />installation, testing and acceptance, CCTV inspections, and flushing and cleaning of the lines of <br />the installed pipes as described above. <br /> Manhole 48 IN. DIA., Type 3 <br /> Manhole 72 IN. DIA., Type 3 <br /> Manhole 96 IN. DIA., Type 3 <br />Measurement and Payment: Each (EA) <br />Measurements shall meet the requirements of 1-09.1. The bid item includes all costs associated with <br />furnishing the tools, labor, equipment, and materials necessary or incidental to install a manhole, <br />including frame and cover. This item includes pavement or concrete surfacing removal, excavation, <br />furnishing and final adjustment of the intake or cover frame or assembly, outlet traps, connection of the <br />storm sewer pipe (including connector), channelization and controlled density fill, backfill and <br />compaction of selected materials around the structure, cleaning structure, and restoration of adjacent <br />areas in a manner acceptable to the Engineer. This item includes interim adjustments as may be <br />required, protection of the structures, cleaning structure, surfacing and restoration of adjacent areas <br />including pavement patching (if not covered by other bid items) in a manner acceptable to the Engineer. <br /> Catch Basin 48 In. Dia., Type 1 <br /> Catch Basin 48 In. Dia., Type 2 <br />Measurement and Payment: Each (EA) <br />Measurements shall meet the requirements of 1-09.1. The bid item includes all costs associated with <br />furnishing the tools, labor, equipment, and materials necessary or incidental to install a catch basin, <br />including frame and grate. This item includes pavement or concrete surfacing removal, excavation, <br />furnishing and final adjustment of the intake or grate, outlet traps, connection of the storm sewer pipe <br />(including connector), channelization and controlled density fill, backfill and compaction of selected <br />materials around the structure, cleaning structure, and restoration of adjacent areas in a manner <br />acceptable to the Engineer. This item includes interim adjustments as may be required, protection of <br />the structures, cleaning structure, surfacing and restoration of adjacent areas including pavement <br />patching (if not covered by other bid items) in a manner acceptable to the Engineer. <br /> Stormwater Pretreatment Structures
The URL can be used to link to this page
Your browser does not support the video tag.