<br />Lenora Regional SW Facility Division P – Proposal Nov. 2025 <br />Work Order # UP3792 SP - lix <br />Category 2: For official use only / disclosure permissible by law. <br />Measurements shall meet the requirements of 1-09.1. The unit cost shall include the labor and <br />materials necessary to perform the work as specified and as on the plans, including ( but not limited <br />to) coordination with the City and scheduling prior to taking the service offline. Coordinating with City <br />Utilities Department for taps into the main, furnishing and installing the service lines, trenching and <br />backfill, preparation and submittal of shop drawings, water service lines, and appurtenances, all <br />fittings, connectors, restrained joints, elbows, T’s, wyes, valve boxes, operators and extensions, <br />supports, excavation, bedding, and pressure testing and chlorination. <br /> Water Service, 2-inch – SW Treatment Site <br />Measurement and Payment: Lump Sum (LS) <br />Measurements shall meet the requirements of 1-09.1. The unit cost shall include the labor and <br />materials necessary to perform the work as specified and as on the plans, including ( but not limited <br />to) coordination for service tap installation by City forces, installing the service lines, trenching and <br />backfill, preparation and submittal of shop drawings, water service lines, DCVA and appurtenances, all <br />fittings, restrained joints, elbows, T’s, wyes, valve boxes, operators and extensions, meters, meter <br />boxes, supports, excavation, bedding, and pressure testing and chlorination. <br /> Trench Excavation for Water Service Tap <br />Measurement and Payment: Cubic Yard (CY) <br />Measurements shall meet the requirements of 1-09.1. The unit cost shall include the labor and materials <br />necessary to perform the work as specified and shall also include backfill, import material from a borrow <br />site, dewatering, bedding, compaction, haul, and disposal of excess or unsuitable material or both. This <br />does not apply to extension or reconnection of existing water services. <br /> Flow Control Device – Flow Split Vault <br />Measurement and Payment: Each (EA) <br />Measurement shall meet the requirements of 1-09.1. The unit cost shall be full compensation for <br />furnishing all tools, equipment, labor and materials necessary to perform the work as specified. <br />Payment shall also include furnishing, installing, testing, and verifying the GNA flow control device <br />(hydroslide) as detailed on the plans and specifications. The cost includes all connecting lines, <br />associated supports, seals, fittings, gate adjustment stem and all appurtenances required for a <br />complete and operable system. <br /> Weirs and Baffles - Flow Split Vault <br />Measurement and Payment: Lump Sum (LS) <br />Measurement shall meet the requirements of 1-09.1. The unit cost shall be full compensation for <br />furnishing all tools, equipment, labor and materials necessary to install the adjustable weirs and <br />baffles including fittings, lifting rings and guides and appurtenances required to perform the work as <br />specified. Payment shall also include furnishing, installing, testing, and verifying the weir elevations <br />as detailed on the plans and specifications. <br /> Weirs and Gates – Treatment Facility <br />Measurement and Payment: Lump Sum (LS)