My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brown and Caldwell 2/12/2026
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Brown and Caldwell 2/12/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 8:34:03 AM
Creation date
2/13/2026 8:32:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brown and Caldwell
Approval Date
2/12/2026
Council Approval Date
2/11/2026
End Date
12/31/2027
Department
Public Works
Department Project Manager
Jeff Marrs
Subject / Project Title
Asset Management Program Phase 1
Tracking Number
0005121
Total Compensation
$564,098.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett AM Program Phase 1 | Scope of Work <br />17 <br />AM Program Ph1 <br />•Review and confirm analysis results of the job plans reviewed and assessed. <br />Meetings <br />•One (1) 1-hour virtual meeting with WFP staff to review maintenance job plan gaps and existing <br />job plan assessment for critical assets. The meeting will be attended by three (3) BC Team <br />members. <br />•One (1) 1-hour virtual meeting with WPCF staff to review maintenance job plan gaps and existing <br />job plan assessment for critical assets. The meeting will be attended by three (3) BC Team <br />members. <br />•One (1) 1-hour virtual meeting with distribution and collection system staff to review <br />maintenance job plan gaps and existing job plan assessment for critical assets. The meeting will <br />be attended by three (3) BC Team members. <br />Work Products <br />•List of critical vertical and linear assets without maintenance job plans. <br />•Draft and final Maintenance Job Plan Review Memorandum <br />Task 603 – CMMS Work Order Prioritization <br />Objective: Formalize CMMS work order prioritization schema for vertical and linear assets. <br />Activities/Approach: This task includes the following activities: <br />•Review existing work order prioritization schema for vertical and linear assets. <br />•Compare existing work order prioritization schema to industry best practices. <br />•Facilitate virtual meetings to review current work order prioritization schema for vertical and <br />linear assets and how it is implemented. <br />•Facilitate a virtual meeting to review recommended work order prioritization schema for vertical <br />and linear assets. <br />•Develop Work Order Prioritization TM summarizing recommended changes to the work order <br />prioritization schema. <br />Task Assumptions <br />•City has a work order prioritization schema for both vertical and linear assets <br />•City can provide description of the prioritization schema for both vertical and linear assets. <br />City Responsibilities <br />•Provide existing work order prioritization schema for both vertical and linear assets along with a <br />definition of each priority level. <br />•Ensure participation in the meeting to review how the prioritization schema is implemented. <br />•Review and approve recommended work order prioritization schema
The URL can be used to link to this page
Your browser does not support the video tag.