City of Everett 00 72 00 - 26
<br />
<br />
<br />
<br />00 72 00 - 26 GENERAL CONDITIONS
<br />actions to eliminate or minimize such interference, including but not limited to: (1) utilizing all
<br />reasonable means of restricting any picketing to a single entrance to the Owner's property; (2) posting
<br />notices or signs which advise interested persons and labor organizations that a particular entrance to the
<br />Owner's property is for the employees of "primary" or, as the case may be, "neutral" employers; (3)
<br />policing entrances to ensure that only authorized personnel may use those entrances; (4) notifying all
<br />interested labor organizations of the "primary" or "neutral" status of particular entrances; and (5) in the
<br />event any such picketing or concerted activity is unlawful or has a secondary impact upon the employees
<br />of neutral employers, promptly and expeditiously taking appropriate action to seek recourse through the
<br />appropriate governmental agency or state or federal courts to limit the location of such picketing so as to
<br />reduce the impact thereof upon neutral employers.
<br />The Owner will cooperate with the Contractor to accomplish the foregoing actions and will render
<br />assistance as may be in the best interests of the Owner. However, the Owner shall have the right to direct
<br />the Contractor to modify any of the foregoing actions the Contractor has taken or plans to take or to
<br />overrule such actions, to designate the entrances to be used as "primary" or "neutral" entrances, and to
<br />take appropriate legal action in order to protect the Owner's property and interests. In any event, the
<br />Contractor shall be liable for all Delays and costs, including costs to the Owner, and actual damages
<br />resulting from the relocation, rerouting, Delays or actions required to maintain the uninterrupted progress
<br />of the Work. Failure by the Contractor to take the actions described above or to comply with the
<br />directives of the Owner shall be considered a breach of this Contract and the Owner may terminate the
<br />Contract or suspend the Contractor as provided in this Contract.
<br />8. MATERIAL, EQUIPMENT, WORKMANSHIP AND CONSTRUCTION UTILITIES
<br />8.1. GENERAL
<br />Unless otherwise specifically stated in the Contract Documents, the Contractor shall provide and pay for
<br />materials, labor, tools, Equipment, water, light, power, transportation, supervision, and temporary
<br />construction of any nature, and other services and facilities of any nature, whatsoever necessary, to
<br />execute, complete and deliver the Work within the specified time. Contractor shall be liable for all power
<br />and water costs until Substantial Completion, whether such power or water is provided by temporary or
<br />permanent facilities. Owner shall not be liable for any costs or Delays arising out of or caused by the
<br />availability or lack of availability of permanent power or utilities. Material and Equipment shall be new
<br />and of the specified quality. Equipment offered shall be new or current specified models. This
<br />requirement does not apply to minor details, or to thoroughly demonstrated improvements in design or in
<br />materials of construction. Construction Work shall be executed in conformity with the standard practice
<br />of the trade.
<br />8.2. PRODUCT DATA
<br />When specified, the Contractor shall provide data required for inspecting, testing, operating, or
<br />maintaining parts of the Work. Unless otherwise specified, such data shall be provided at the time the
<br />referenced material or Equipment is delivered to the job Site. The data shall be as specified and shall
<br />include, unless otherwise specified, such items as shop drawings, erection drawings, reinforcing steel
<br />schedules, testing and adjusting instructions, operations manuals, maintenance procedures, parts lists, and
<br />record drawings. Such data shall be provided as part of the Work under this Contract and its acceptability
<br />determined by the Owner in its sole discretion.
<br />8.3. QUALITY
<br />Where detailed Specifications of materials, Equipment, or construction Work are not set forth, the
<br />Contractor shall perform the Work using materials and Equipment of a quality comparable to the
<br />materials and workmanship specified for the other parts of the Work, from firms of established good
<br />reputations, and shall follow standard practices to perform construction Work of good quality in a
<br />workmanlike way. Work performed shall be in conformity and harmony with the intent to secure the
|