My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Apex Mechanical LLC 2/23/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Apex Mechanical LLC 2/23/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2026 3:13:53 PM
Creation date
2/23/2026 2:49:30 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Apex Mechanical LLC
Approval Date
2/23/2026
Council Approval Date
2/4/2026
Department
Transit
Department Project Manager
Joan Olsen
Subject / Project Title
Everett Station HVAC and Controls Improvements
Tracking Number
0005125
Total Compensation
$1,938,636.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 72 00 - 27 <br /> <br /> <br /> <br />00 72 00 - 27 GENERAL CONDITIONS <br />standard of construction and Equipment of Work as a whole and in part. All Work must comply and <br />conform to applicable building codes in effect when the Work is performed. <br />8.4. MATERIAL AND EQUIPMENT SPECIFIED BY NAME <br />When material or Equipment is specified by reference to patents, brand names, or catalog numbers, the <br />Owner will not usually consider or approve a substitution. However, the Contractor may offer <br />substitutions of products it considers to be equal to that specified, but the Owner is not obliged or required <br />to consider or accept such offered substitution. <br />8.5. REQUESTS FOR SUBSTITUTION <br />The Contractor may offer material or Equipment of equal or better quality and performance in <br />substitution for those specified. Only the Contractor may request substitutions. The Contractor's offers of <br />substitution shall be made in writing to the Owner’s Representative and shall include sufficient data to <br />enable the Owner’s Representative to assess the acceptability of the material or Equipment for the <br />particular application and requirements. The Owner and Owner’s Representative are not required or <br />obligated to consider or review a request for substitution and may, in their sole discretion and option, <br />consider or review such requests. <br />If the offered substitution requires changes to or coordination with other portions of the work, the <br />Contractor shall include with its substitution request any such drawings and details showing such <br />changes. The Contractor agrees to perform these changes as part of the substitution of material or <br />Equipment at no additional cost to the Owner. Approval of a substitution request shall not relieve the <br />Contractor from responsibility for the efficiency, quality, and performance of the substitute material or <br />Equipment, in the same manner and degree as the material and Equipment originally specified. Any cost <br />differential associated with a substitution shall be reflected in the offer. If the Owner approves the <br />substitution, the Contract Documents shall be modified by a Change Order modifying the Contract Sum <br />in the amount of the cost differential. <br />8.6. DEMONSTRATION OF COMPLIANCE WITH CONTRACT REQUIREMENTS <br />8.6.1. Inspection <br />The burden of proving the constructed Work complies with the Contract Documents shall be on the <br />Contractor at all times. To demonstrate its compliance with the Contract requirements, the Contractor <br />shall assist the Owner’s Representative in his or her inspection and observation of the Work. The <br />Contractor shall grant the Owner’s Representative access to the Work and Work Site, and to places where <br />Work is being prepared, or where materials, Equipment, or machinery are being obtained for Work. The <br />Contractor shall provide information requested by the Owner’s Representative in connection with <br />inspection work. <br />If the Contract Documents, laws, ordinances, or any public regulatory authority requires parts of the Work <br />to be specially inspected, tested, or approved, the Contractor shall give the Owner’s Representative <br />adequate prior written Notice of the availability of the subject Work for examination, which Notice shall <br />be not less than two (2) working days. <br />Inspection and quality control tests performed on Work by the Contractor by the Owner’s Representative <br />shall not relieve the Contractor of its responsibility for errors or lack of quality therein and shall not be <br />regarded as an assumption of risks or liability by the Owner’s Representative for the Contractor's <br />compliance with these Contract Documents. Contractor remains responsible and liable for all errors, <br />defects or a lack of quality not discovered by inspection or observation. <br />If parts of the Work are covered prior to inspection or observation, the cost of exposing the Work for <br />inspection and closing and re-covering shall be borne by the Contractor regardless of whether the Work is <br />found to be in compliance with the Contract.
The URL can be used to link to this page
Your browser does not support the video tag.