My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Apex Mechanical LLC 2/23/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Apex Mechanical LLC 2/23/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2026 3:13:53 PM
Creation date
2/23/2026 2:49:30 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Apex Mechanical LLC
Approval Date
2/23/2026
Council Approval Date
2/4/2026
Department
Transit
Department Project Manager
Joan Olsen
Subject / Project Title
Everett Station HVAC and Controls Improvements
Tracking Number
0005125
Total Compensation
$1,938,636.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT BID SET <br />EVERETT STATION HVAC AND CONTROLS IMPROVEMENTS <br />PROJECT NO. 24-3201 <br /> <br />01 29 73 -2 SCHEDULE OF VALUES <br />B. Correlate corresponding items listed by Schedule of Values line items with other required administrative <br />schedules and forms, including: <br />1. Contractor's Construction Progress Schedule. <br />2. Application for Payment forms, including Continuation Sheets. Correlate Schedule of Values line <br />items to that listed by Application for Payment: <br />a. Correspond to indirect costs and margins on actual cost. <br />b. Make amounts for total coast and overhead and profit complete and proportionate. <br />c. Include overhead and profit as a single line item. <br />3. List of subcontractors. <br />4. List of principal suppliers and fabricators. <br />5. Schedule of submittals and list of products. <br />C. Use as basis for determining dollar value amount for each work activity and component of work for duration <br />of Project. <br />D. Make Scheduled of Values total sum equal to current Contract Sum. <br />E. Round-off figures to nearest dollar amount. <br />F. Identify Schedule of Value line items by corresponding Section Titles in Project Manual Table of Contents. <br />G. Break down major portion of work by areas, disciplines, phase, systems, or as appropriate for ease of <br />review. <br />H. For work that exceeds 1 percent of Contract Sum, break out separate line items according to major work <br />activities, components, products, or operations. <br />1.06 CONTENT <br />A. Identification: Include the following Project identification on the Schedule of Values: <br />1. Project name and location. <br />2. Owner's name. <br />3. Name of the Architect / Engineer. <br />4. Project number. <br />5. Contractor's name and address. <br />6. Date of original submittal. <br />7. Date of revised submittals. <br />B. Work Activities: Indicate Cost Values for labor, material, equipment, and Contractor's overhead and profit, <br />and Total Cost Value for each line item.
The URL can be used to link to this page
Your browser does not support the video tag.