My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Apex Mechanical LLC 2/23/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Apex Mechanical LLC 2/23/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2026 3:13:53 PM
Creation date
2/23/2026 2:49:30 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Apex Mechanical LLC
Approval Date
2/23/2026
Council Approval Date
2/4/2026
Department
Transit
Department Project Manager
Joan Olsen
Subject / Project Title
Everett Station HVAC and Controls Improvements
Tracking Number
0005125
Total Compensation
$1,938,636.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT BID SET <br />EVERETT STATION HVAC AND CONTROLS IMPROVEMENTS <br />PROJECT NO. 24-3201 <br /> <br />01 32 16 -2 CONSTRUCTION PROGRESS SCHEDULE <br /> <br />1.04 UPDATES <br /> The Project Construction Schedule will be reviewed and updated at each progress meeting. All changes to <br />the project schedule of more than three (3) working days shall be documented. The Schedule shall be <br />updated to show measures required to bring project back on schedule. The Contractor alone shall remain <br />responsible for adjusting forces, equipment, and work schedules to ensure completion of the work within the <br />Contract Time. Any mistakes or errors in any schedule, including, but not limited to, mistakes or errors of <br />logic, order, precedence, and duration, are and remain the Contractor's. <br /> Should any activity not be completed by the stated scheduled date, the Owner will have the right to require <br />the Contractor to expedite completion of the activity by whatever means appropriate and necessary, without <br />additional compensation to the Contractor. <br /> The Schedule shall be used to justify time extension days requested by the Contractor. For additional days <br />requested, the Schedule shall be detailed enough to identify the work item(s) affected and the relationship <br />to the changed or added work. <br /> Schedule shall be provided during the construction meetings. Schedule shall be on 11x17 paper or as <br />otherwise approved by Owner and shall show current work progress. <br />1.05 OWNER PROVIDED MATERIALS <br /> All items to be provided by the Owner shall be incorporated into the schedule. The schedule shall show when <br />the materials are required to be delivered to the project and when the materials will be installed. These <br />materials are to be included in the preliminary schedule, upon review; owner will confirm lead time for <br />materials and delivery dates. <br /> Contractor failure to include owner provided materials into the schedule shall be responsible for all delays to <br />the work or failure to notify the owner of tasks dependent upon the owner furnished materials shall <br />constitute a waiver by the contractor of any contract claim arising out of or related to the timeliness of the <br />delivery of materials or installation of such materials. <br />PRODUCTS (NOT USED) <br />EXECUTION (NOT USED) <br />END OF SECTION 01 32 16