Laserfiche WebLink
CITY OF EVERETT BID SET <br />EVERETT STATION HVAC AND CONTROLS IMPROVEMENTS <br />PROJECT NO. 24-3201 <br /> <br />01 35 29 -1 HEALTH AND SAFETY <br /> <br />GENERAL <br />1.01 SECTION INCLUDES <br /> This Section covers the requirements for compliance with health and safety precautions and controls for <br />projects without hazardous waste operations. <br /> Safety plan. <br /> Protection of equipment, public and city staff. <br />1.02 REFERENCES <br /> General: The publications listed below form a part of these specifications to the extent referenced. The <br />publications are referred to in the text by basic designations only. <br /> Code of Federal and State Regulations <br /> OSHA General Industry Safety and Health Standards (29 CFR 1910), Publication V2206; OSHA <br />Construction Industry Standards (29 CFR 1926.) <br /> National Emission Standards for Hazardous Air Pollutants (40 CFR, part 61). <br /> Washington State Department of Labor and Industries (WISHA) 49.17-49.26 RCW <br /> Washington Administration Code (WAC) 296-155 Safety Standards for Construction Work <br />1.03 SUBMITTALS <br /> The following submittals are required to be delivered within 5 days after Notice to Proceed has been received. <br /> Health and Safety Plan (specific to this project) <br /> Fall Protection Plan Specific to each building. <br /> Copies of all minutes/notes from daily safety meetings. <br />1.04 ACCIDENT REPORTING <br /> Serious accidents such as those resulting in treatment of an injury at a medical facility, response to the site <br />by emergency medical personnel or damage to property other than that of the Contractor shall be reported <br />to the Owner within twenty-four (24) hours of the occurrence. <br /> A copy of each accident report, which the Contractor or subcontractors have submitted to their insurance <br />carriers, shall be forwarded to the Owner as soon as possible, but in no event later than seven (7) calendar <br />days after the accident occurred. <br />1.05 PLAN <br /> The Contractor shall develop a Site Specific Health and Safety Plan addressing health and safety management <br />methods specific to the project. The Plan shall, at a minimum, include: <br /> The name of the individual at the jobsite responsible for implementation and compliance with this <br />Plan.