My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Apex Mechanical LLC 2/23/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Apex Mechanical LLC 2/23/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2026 3:13:53 PM
Creation date
2/23/2026 2:49:30 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Apex Mechanical LLC
Approval Date
2/23/2026
Council Approval Date
2/4/2026
Department
Transit
Department Project Manager
Joan Olsen
Subject / Project Title
Everett Station HVAC and Controls Improvements
Tracking Number
0005125
Total Compensation
$1,938,636.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT BID SET <br />EVERETT STATION HVAC AND CONTROLS IMPROVEMENTS <br />PROJECT NO. 24-3201 <br /> <br />01 35 29 -3 HEALTH AND SAFETY <br /> <br /> The Health and Safety Representative is responsible to insure that work is performed in accordance with the <br />Health and Safety Plan. <br /> At the daily job briefing and/or tailgate conference, Contractor shall provide the Owner's representative in <br />attendance at the meeting all relevant information on the Work to be performed, its location, and the <br />equipment to be used. <br /> The Contractor is responsible to insure that its workers and subcontractors have all safety equipment required <br />for the Work. <br /> Nothing in this Contract shall be construed as imposing any duty upon the Owner or any of its employees with <br />regard to, or as constituting any express or implied assumption of control or responsibility over, Project Site <br />safety, or over any other safety conditions relating to employees or agents of Contractor or any of its <br />Subcontractors, or the public. <br />PRODUCTS (NOT USED) <br />EXECUTION (NOT USED) <br />END OF SECTION 01 35 29 <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.