My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Apex Mechanical LLC 2/23/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Apex Mechanical LLC 2/23/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2026 3:13:53 PM
Creation date
2/23/2026 2:49:30 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Apex Mechanical LLC
Approval Date
2/23/2026
Council Approval Date
2/4/2026
Department
Transit
Department Project Manager
Joan Olsen
Subject / Project Title
Everett Station HVAC and Controls Improvements
Tracking Number
0005125
Total Compensation
$1,938,636.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT BID SET <br />EVERETT STATION HVAC AND CONTROLS IMPROVEMENTS <br />PROJECT NO. 24-3201 <br /> <br /> <br />01 35 44 - 1 HAZARDOUS MATERIALS PROCEDURES <br /> <br />SECTION 01 35 44 - HAZARDOUS MATERIALS PROCEDURES <br />PART 1 - GENERAL <br />1.1 SUMMARY <br />A. Section Includes: Hazardous materials abatement, Under the Work of this Contract, including proper remediation of <br />Asbestos Containing Materials, Lead remediation, Light Fixture Component recycling of fluorescent tubes containing <br />mercury and proper disposal of ballasts containing polychlorinated biphenyls (PCB), as well as Biohazard pre- <br />cleaning and Silica remediation prior to and during demolition, transportation and proper disposal of construction <br />waste materials. <br />B. Renovation, Selective Demolition for the employer compliance with current federal, state and local health and <br />safety regulations for construction in the commercial building, Under the Work of the Contract. Other than <br />methods used to minimize the creation of dust, prompt cleanup and employer compliance with current regulations <br />to reduce the potential for worker exposure to potential hazardous materials, no abatement has been scheduled <br />for the Everett Station. A Limited Hazmat Report has been completed and can be found in Appendix B. <br />1.2 ASBESTOS REMEDIATION <br />A. Conform to Authorities Having Jurisdiction for asbestos remediation including PSCAA, WISHA and EPA regulations. <br />B. Claims or requests for additional work will not be accepted for any hidden friable or non-friable asbestos containing <br />materials identified during abatement and demolition. The base bid should cover complete abatement of all <br />surfacing material, and any hidden overspray on building materials, wallboard systems with < 1% asbestos <br />containing material, hidden vinyl asbestos flooring, vinyl paper backing and asbestos containing black floor mastic, <br />and any asbestos containing black mastic found on walls in the building as noted on drawings and specifications. <br />C. All remediation work shall be in conformance with Authorities Having Jurisdiction and as directed by the Owner and <br />coordinated with other construction activities at the work site as specified in the Work of this Contract. <br />D. Off-Limit Areas: Do not allow unauthorized personnel to enter areas marked by "Danger Asbestos Hazard" and <br />other required warning labels and signage. <br />1.3 LEAD REMEDIATION <br />A. Conduct lead hazard control activities, minimize dust and immediately clean up dust from all work activities, <br />demolition and disposal of <br />B. Conform to Authorities Having Jurisdiction for regulations, laws, and ordinances for controlled removal, handling, <br />storage, disposal, and using initial monitoring and required personal protective equipment for worker protection. <br />This includes taking measures to: <br /> <br />1. Contain paint particulates as required to prevent them from becoming airborne and escaping the work area <br />into the environment. <br />2. Remediation and stabilization of deteriorated, peeling, and flaking paint, clean up damaged building <br />materials prior to being removed, controlling dust during abatement, demolition, transport and disposal. <br />3. Conduct representative waste stream sampling and analysis for proper disposal using the Toxicity <br />Characteristic Leaching Procedure (TCLP test).
The URL can be used to link to this page
Your browser does not support the video tag.