My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Apex Mechanical LLC 2/23/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Apex Mechanical LLC 2/23/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2026 3:13:53 PM
Creation date
2/23/2026 2:49:30 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Apex Mechanical LLC
Approval Date
2/23/2026
Council Approval Date
2/4/2026
Department
Transit
Department Project Manager
Joan Olsen
Subject / Project Title
Everett Station HVAC and Controls Improvements
Tracking Number
0005125
Total Compensation
$1,938,636.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett Everett Station HVAC and Controls Improvements 00 21 13 - 15 <br /> <br /> <br /> <br />00 21 13 - 15 INSTRUCTIONS TO BIDDERS <br />Department of Labor and Industries, Olympia, Washington. If the prime contract <br />is over $1,000,000, then Contractor also needs to submit L&I Form F700-164-000 <br />(Affidavit of Wages Paid EHB 2805 Addendum). <br />6. Weekly Statement with Respect to Payment of Wages (U.S. Dept of Labor Form <br />WH347): Contractors, Subcontractors, and agents to Subcontractors using Payroll <br />Form WH347 may use State of Compliance found on the back of the form. <br />7. Weekly Statement of Compliance (U.S. Dept of Labor Form WH348). Contractors, <br />Subcontractors, or agents to Subcontractors not using Payroll Form WH347 shall <br />attach the Statement of Compliance Form WH348 to each payroll. <br />8. Approval of Subcontractors: Contractors shall request approval of Subcontractors <br />on a form provided by the City prior to their working on the Site. <br />9. Construction Progress Schedule: To be submitted as required by Section 00 72 <br />00, Part 5 “Progress and Completion”, of the Contract Documents by the <br />Contractor within ten calendar days, or such time as determined by the City, after <br />the date of receipt of Notice to Proceed. <br />10. Traffic Control Plan: Standard Traffic Control Plans are included in the City’s <br />Design and Construction Standards. If, and to the extent, such plans are not <br />sufficient, complete or adequate to support the Bidder’s planned means and <br />methods of performing the Work, the Bidder must develop an adequate, complete <br />and sufficient traffic control plan at its cost, that shall be submitted for the City’s <br />approval prior to construction. Deviation from the Standard Plans must be <br />submitted by the Contractor and approved by the City prior to construction. <br />11. Disposal Sites: Provide the City with the location of all disposal sites to be used, <br />and also provide copies of the permits and approvals for such disposal sites. The <br />Contractor shall provide the City with copies of all permits for disposal and storage <br />of surplus materials within ten calendar days after award of the Contract. <br /> <br />END OF SECTION 00 21 13
The URL can be used to link to this page
Your browser does not support the video tag.