My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Apex Mechanical LLC 2/23/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Apex Mechanical LLC 2/23/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2026 3:13:53 PM
Creation date
2/23/2026 2:49:30 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Apex Mechanical LLC
Approval Date
2/23/2026
Council Approval Date
2/4/2026
Department
Transit
Department Project Manager
Joan Olsen
Subject / Project Title
Everett Station HVAC and Controls Improvements
Tracking Number
0005125
Total Compensation
$1,938,636.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett Everett Station HVAC and Controls Improvements 00 22 13 - 1 <br /> <br /> <br />00 22 13 - 1 SUPPLEMENTAL INSTRUCTIONS TO BIDDERS <br /> <br />SECTION 00 22 13 - SUPPLEMENTAL INSTRUCTIONS TO BIDDERS <br />PART 1 - GENERAL <br />1.1 GENERAL <br />A. It is the intent of City to award a contract to the lowest responsive and responsible Bidder. <br />Before award, the Bidder must also meet the supplemental bidder responsibility criteria <br />listed below. Further, the apparent low Bidder and second apparent low bidder must <br />submit the Bidder Qualification Statement (Section 00 45 13) and any other <br />documentation listed below to the City within one business day after the bid opening, <br />unless the City’s project manager, in writing, allows additional time. The City reserves <br />the right to require such documentation from other bidders also. <br />1.2 SUPPLEMENTAL RESPONSIBILITY CRITERIA <br />A. Experience <br />1. Criteria: <br />a. The Bidder must have successfully completed at least three (3) Similar <br />Projects within the five (5) years prior to bid opening. <br />b. The Bidder’s project manager for the Project must have successfully <br />supervised to completion at least three (3) Similar Projects within the five (5) <br />years prior to bid opening. <br />c. The Bidder’s superintendent for the Project must have successfully <br />supervised to completion at least three (3) Similar Projects within the five (5) <br />years prior to bid opening <br />d. The Bidder’s principal foreman for the Project must have successfully <br />supervised to completion at least three (3) Similar Projects within the five (5) <br />years prior to bid opening. <br />2. Definition of Similar Project: <br />a. A “Similar Project” means a project that meets all of the following <br />requirements: <br />1) Awarded total contract value of at least $750,000. <br />2) Work involving the construction of large-scale infrastructure <br />components within a five (5) year period. <br />3) Work involving the installation and commissioning of large-scale <br />electrical or HVAC infrastructure. <br />3. Documentation: The Bidder shall submit the Bidder Qualification Statement as <br />provided in Section 00 45 13. The City may also use independent sources of <br />information that may be available to demonstrate whether the Bidder is in <br />compliance with these criteria. <br />4. Evaluation: In evaluating whether these criteria are met, the City may check <br />references for the previous projects and may evaluate the project owner’s <br />assessment of the Bidder’s performance, including but not limited to the following <br />areas: <br />a. Quality control; <br />b. Safety record;
The URL can be used to link to this page
Your browser does not support the video tag.