My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specialty Equipment Inc. (SEI) dba Neptune General Contractors 4/6/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Specialty Equipment Inc. (SEI) dba Neptune General Contractors 4/6/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2026 3:58:27 PM
Creation date
4/6/2026 3:50:41 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Specialty Equipment Inc. (SEI) dba Neptune General Contractors
Approval Date
4/6/2026
Council Approval Date
3/25/2026
End Date
3/25/2027
Department
Public Works
Department Project Manager
Emily Coba
Subject / Project Title
Greely Street Water Quality Retrofit Construction
Tracking Number
0005187
Total Compensation
$475,187.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
325
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />Greely St. Water Quality Retrofit Division 1 – GENERAL REQUIREMENTS January 2026 <br />WO No. UP3817 SP – 107 <br />1-08.3(4) Measurement <br />Delete 1-08.3(4). <br />1-08.3(5) Payment <br />Delete 1-08.3(5) and substitute the following: <br />Costs incurred in performance of this Work shall be included in the contract bid <br />items and no direct compensation shall be paid. <br />1-08.4 Prosecution of Work <br />Delete 1-08.4 and substitute the following: <br />1-08.4 Notice to Proceed and Prosecution of Work <br />(******) <br />The City will issue a Notice to Proceed after the Contract has been executed and the Contract <br />Bonds and evidence of insurance have been approved and filed by the City. The Contractor <br />shall not commence with the Work until the Notice to Proceed has been given by the City. <br />The Contractor shall commence construction activities on the Project site within 14 calendar <br />days of the Notice to Proceed Date, unless otherwise approved in writing. The Contractor <br />shall diligently pursue the Work to the Physical Completion Date within the time specified in <br />the Contract. Voluntary shutdown or slowing of operations by the Contractor shall not relieve <br />the Contractor of the responsibility to complete the Work within the time(s) specified in the <br />Contract. <br />The City is not obligated to accept or pay for Work performed by the Contractor or be liable <br />for any Delays, prior to delivery of the Notice to Proceed. The City’s knowledge of Work <br />being performed prior to delivery of the Notice to Proceed will not obligate the City to accept <br />or pay for such Work. Contractor waives any and all Contract Claims for an adjustment of <br />Contract Sum or Contract Time arising out of, or related to, Work it performs prior to receipt <br />of the Notice to Proceed. <br />The City may issue partial Notices to Proceed. Contractor may seek permission in writing to <br />perform some Work prior to issuance to the Notice to Proceed, such as shop drawings, <br />equipment and material Submittals, or surveying and the City or City’s Representative may, <br />in its sole discretion, approve in writing such Work prior to the issuance of the Notice to <br />Proceed. <br />Supplement 1-08.4 by adding the following: <br />1-08.4(1) Construction Progress <br />(******) <br />The Contractor shall furnish all labor, materials, facilities and Equipment necessary to <br />ensure the prosecution and completion of the Project within the interim milestones, <br />Substantial Completion, Physical Completion and Completion Dates of the Contract. If <br />Work falls seven calendar days or more behind the reviewed Preliminary Schedule, the <br />Contractor agrees that, at its sole cost and expense, it will take all actions necessary to <br />return the Project to the accepted schedule. These actions may include the following: <br />a. Increase labor in quantities and crafts. <br />b. Increase the number of working hours per shift, shifts per working day, <br />working days per week, or the amount of Equipment, or any combination of <br />the foregoing. <br />c. Reschedule activities. <br />If requested by the City’s Representative, the Contractor shall prepare a proposed <br />schedule revision demonstrating a plan to make up the lag in progress and insure <br />completion of the Work within the Contract Time. All actions taken to return the Project <br />to the accepted schedule are at the Contractor's expense.
The URL can be used to link to this page
Your browser does not support the video tag.