My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specialty Equipment Inc. (SEI) dba Neptune General Contractors 4/6/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Specialty Equipment Inc. (SEI) dba Neptune General Contractors 4/6/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2026 3:58:27 PM
Creation date
4/6/2026 3:50:41 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Specialty Equipment Inc. (SEI) dba Neptune General Contractors
Approval Date
4/6/2026
Council Approval Date
3/25/2026
End Date
3/25/2027
Department
Public Works
Department Project Manager
Emily Coba
Subject / Project Title
Greely Street Water Quality Retrofit Construction
Tracking Number
0005187
Total Compensation
$475,187.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
325
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />Greely St. Water Quality Retrofit Division 1 – GENERAL REQUIREMENTS January 2026 <br />WO No. UP3817 SP – 121 <br />The City has estimated and included in the Proposal dollar amounts for all items to be <br />paid per Force Account. This is done only to provide a common Bid for Bidders. All <br />such dollar amounts are to become a part of Contractor's total bid. However, the City <br />does not warrant expressly or by implication that the actual amount of Work will <br />correspond with those estimates. Payment will be made on the basis of the amount of <br />Work actually authorized by Engineer. <br />1-09.7 Mobilization <br />Supplement 1-09.7 by adding the following: <br />(o) 1. Construction Identification Signs: Upon commencement of Work, the <br />Contractor shall furnish and erect two Project/Construction Identification Signs in <br />accordance with COE Standard Drawing No. 714, one at each end of each work <br />area at Engineer approved locations. <br />a. Contractor shall provide sign painting, lettering and detailing by a professional <br />sign maker with Engineer approval prior to placement on job site. <br />b. Contractor shall provide a Project Information Sign for each of the two <br />Project/Construction Identification Signs. Attach Project Information Sign to <br />the surface of the sign face in accordance with COE Standard Plan No. 714. <br />The Construction Identification Sign shall contain the following three lines of <br />information that the Engineer will provide: <br /> PROJECT NAME: <br />PROJECT FUNDING: <br />PROJECT COST: <br />c. The Contractor shall display the Department of Ecology’s logo in a manner <br />that informs the public that the project received financial assistance from the <br />Washington State Stormwater Grant Program. This information shall be <br />incorporated into the project sign <br />d. Contractor shall maintain signs and sign frames in a clearly legible condition <br />throughout the progress of the Work and shall completely remove signs upon <br />project completion. Deliver signs to the City's storage area for future City <br />use. <br />d. No separate payment for Project/Construction Identification Signs will be <br />made. All costs associated with this item shall be merged with the unit <br />contract price for "Mobilization." <br />1-09.9 Payments <br />Delete 1-09.9 and substitute the following: <br />1-09.9 Payments to Contractors <br />(******) <br />1-09.9(1) Progress Payments <br />Contractor shall submit progress payment estimate for completed Work and material on <br />hand based upon acceptable Work performed during the previous month, or since the <br />last partial payment estimate was submitted. Submit progress payment estimate to <br />City’s Representative by the tenth day of each month, or by schedule mutually agreed <br />upon in writing by the Contractor and City’s Representative at the Pre-Construction <br />Conference. Contractor shall make initial progress estimate not later than 30 days after <br />the Work begins. Make successive progress estimates every month thereafter until the <br />Completion Date.
The URL can be used to link to this page
Your browser does not support the video tag.