Laserfiche WebLink
Port Gardner Storage Facility West Marine View Drive Storm and Combined Sewer - Exhibit A Scope of Work <br /> <br />11 <br /> <br />• Focus meetings will be held on an as needed basis to discuss topics needing more time <br />than available in the weekly coordination meetings. There will be a total of 20, 2-hour long, <br />focus meetings held virtually. Submit agenda items for inclusion in the City prepared agenda <br />at least 3 days prior to the meeting date. <br />Assumptions: <br />• The City or City’s CM will schedule, organize, and facilitate the meetings. <br />• At minimum, the meetings will be attended by the City PR and selected City project team <br />members as needed for discussion of task items in progress. <br />• BC will prepare meeting agenda and notes for any special meetings requested by the <br />Engineer. Otherwise, special meetings requested by City, or City’s CM staff will have meeting <br />notes prepared by City’s CM staff. <br />Deliverables: <br />• Meeting agenda items sent to City to be included in City-prepared agenda <br />Task 1021.3 Site Visit Meetings and Ad-hoc Field Visits <br />BC will perform site visits at the construction site at a frequency commensurate with construction <br />progress to remain informed and engaged with construction progress and to facilitate RFI responses, <br />submittal reviews, or resolve engineering and permit issues. <br />Activities/Approach: <br />• Prepare for and participate in team meetings with the City PR and other City staff. Site visit <br />meetings will be held at a frequency commensurate with construction progress and on an as <br />needed basis to discuss topics needing a field visit. There will be an estimated total of 30, 2- <br />hour-long site visit meetings, attended by an engineering staff member. Travel time of one <br />and a half hours and one hour of prep and one hour of follow-up coordination is included in <br />the estimate. An estimated 40 hours of informal consultation will be provided for City <br />questions and requests for information not related to a Contractor RFI. <br />• BC will inform the City PR if a site visit is required. <br />• Create a site observation form. <br />• Attend Contractor safety training as requested by the Contractor and City PR. <br />Assumptions: <br />• The City or City’s CM will schedule and organize the site visits as needed. The City or City’s <br />CM will inform the Contractor of the visit. <br />• The City or City’s CM will provide site access during normal working hours when requested, <br />including prior to and after contractor mobilization to the site. <br />• BC will be provided access to the construction site without requiring advanced notice. <br />• BC will adhere to the Contractor safety requirements in addition to their own Site-Specific <br />HASP. <br />• Ad-hoc field visits will be scheduled on an as-needed basis and will not exceed 5 visits with 2 <br />BC staff each visit. <br />Deliverables: <br />• Field memoranda documenting engineer field visits and meetings attendance notes (for <br />Engineer called meetings)