My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brown and Caldwell, Inc. 4/11/2026 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Brown and Caldwell, Inc. 4/11/2026 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2026 3:27:37 PM
Creation date
4/13/2026 3:26:48 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brown and Caldwell, Inc.
Approval Date
4/11/2026
Council Approval Date
4/8/2026
End Date
12/31/2028
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF WMVD Storm and Combined Sewer
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003935
Total Compensation
$3,783,388.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Brown and Caldwell, Inc. 9/20/2023
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Port Gardner Storage Facility West Marine View Drive Storm and Combined Sewer - Exhibit A Scope of Work <br /> <br />11 <br /> <br />• Focus meetings will be held on an as needed basis to discuss topics needing more time <br />than available in the weekly coordination meetings. There will be a total of 20, 2-hour long, <br />focus meetings held virtually. Submit agenda items for inclusion in the City prepared agenda <br />at least 3 days prior to the meeting date. <br />Assumptions: <br />• The City or City’s CM will schedule, organize, and facilitate the meetings. <br />• At minimum, the meetings will be attended by the City PR and selected City project team <br />members as needed for discussion of task items in progress. <br />• BC will prepare meeting agenda and notes for any special meetings requested by the <br />Engineer. Otherwise, special meetings requested by City, or City’s CM staff will have meeting <br />notes prepared by City’s CM staff. <br />Deliverables: <br />• Meeting agenda items sent to City to be included in City-prepared agenda <br />Task 1021.3 Site Visit Meetings and Ad-hoc Field Visits <br />BC will perform site visits at the construction site at a frequency commensurate with construction <br />progress to remain informed and engaged with construction progress and to facilitate RFI responses, <br />submittal reviews, or resolve engineering and permit issues. <br />Activities/Approach: <br />• Prepare for and participate in team meetings with the City PR and other City staff. Site visit <br />meetings will be held at a frequency commensurate with construction progress and on an as <br />needed basis to discuss topics needing a field visit. There will be an estimated total of 30, 2- <br />hour-long site visit meetings, attended by an engineering staff member. Travel time of one <br />and a half hours and one hour of prep and one hour of follow-up coordination is included in <br />the estimate. An estimated 40 hours of informal consultation will be provided for City <br />questions and requests for information not related to a Contractor RFI. <br />• BC will inform the City PR if a site visit is required. <br />• Create a site observation form. <br />• Attend Contractor safety training as requested by the Contractor and City PR. <br />Assumptions: <br />• The City or City’s CM will schedule and organize the site visits as needed. The City or City’s <br />CM will inform the Contractor of the visit. <br />• The City or City’s CM will provide site access during normal working hours when requested, <br />including prior to and after contractor mobilization to the site. <br />• BC will be provided access to the construction site without requiring advanced notice. <br />• BC will adhere to the Contractor safety requirements in addition to their own Site-Specific <br />HASP. <br />• Ad-hoc field visits will be scheduled on an as-needed basis and will not exceed 5 visits with 2 <br />BC staff each visit. <br />Deliverables: <br />• Field memoranda documenting engineer field visits and meetings attendance notes (for <br />Engineer called meetings)
The URL can be used to link to this page
Your browser does not support the video tag.