My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brown and Caldwell, Inc. 4/11/2026 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Brown and Caldwell, Inc. 4/11/2026 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2026 3:27:37 PM
Creation date
4/13/2026 3:26:48 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brown and Caldwell, Inc.
Approval Date
4/11/2026
Council Approval Date
4/8/2026
End Date
12/31/2028
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF WMVD Storm and Combined Sewer
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003935
Total Compensation
$3,783,388.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Brown and Caldwell, Inc. 9/20/2023
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Port Gardner Storage Facility West Marine View Drive Storm and Combined Sewer - Exhibit A Scope of Work <br /> <br />5 <br /> <br />Everett Responsibilities <br />• Review and provide comments for all documents for each package <br />Meetings <br />• Up to 6 total coordination meetings with PSE, Port, Ecology <br />Work Products <br />• 100%, and Final Contract documents <br />• Final BODR <br />• Coordination Meeting Minutes <br />Bid Period Services <br />Phase 710 – Bid Period Services <br />Objective: To assist the City during the bidding time period for each of the identified construction <br />packages. <br />Activities/Approach: <br />• Preparation of Bid Addenda to answer Bidder questions and provide edits, changes, or <br />clarifications to bid documents. <br />• Complete conformed “for construction” contract documents incorporating addenda from the <br />bidding period. <br />• Respond to contractor RFIs during bidding period <br />• Attend pre-bid meetings <br />• Review bid submissions along with the City, noting any informalities. Check bidder references <br />as appropriate. <br />Assumptions <br />• Bidder qualifications will be included in the bidding documents (i.e. no separate pre- <br />qualification step prior to formal bid period). <br />• Total of 10 bidder questions during bid period. <br />• Total of 2 addendum, that will consist of drawing updates (noted with revision clouds) and <br />changes to the text on contents of the specifications. <br />• Total of 5 bid submissions per bid. <br />• One electronic deliverable (PDF) set of “for construction” documents will be provided for the <br />Conformed Documents. No hard copy prints are included as part of this scope. <br />• Services include up to 2 “Bid Period Services”. <br />• Prebid meeting will be in person. <br />• 1 tour per bid package, up to 4 hours in duration. <br />Everett Responsibilities <br />• Coordinate bid period activities. <br />• Finalize Instructions to Bidders, General and Supplementary Conditions. <br />• Solicit and administer public bids for the construction package.
The URL can be used to link to this page
Your browser does not support the video tag.