Port Gardner Storage Facility West Marine View Drive Storm and Combined Sewer - Exhibit A Scope of Work <br /> <br />6 <br /> <br />• Receive and disseminate requests for information to Consultant and City responders. <br />• Hold pre-bid meeting and pre-bid tours by prospective contractors. <br />• Review bids. <br />• Obtain construction phase permits, or assign responsibility to contractor. <br />• Award construction contract to lowest, responsive and qualified bidder. Administer and <br />execute all contract forms. <br />Meetings <br />• Prebid meetings (2). <br />Work Products <br />• Replies to bidder questions <br />• 2 addendum <br />• Bid review recommendations and bidder reference summaries. <br />• Conformed “For Construction” Documents <br />Services During Construction (SDC) <br />Phase 1010 – SDC Project Management <br />BC is responsible for consulting services in project management, project tracking and reporting <br />directly to the City Project Representative (PR). These responsibilities include overall coordination <br />and oversight of the Engineer team and administration of the contract to complete the Scope of <br />Work within budget. BC shall also manage their work to meet the established project milestones and <br />schedule. The Construction Administrator (CA) is a member of the BC team responsible for oversight <br />and coordination of Engineer construction phase activities. The CA operates within the boundaries of <br />Engineer responsibilities and does not assume duties assigned to the City, City’s CM, or contractors. <br />The CA will work with the BC Project Manager to oversee the following requirements. This phase <br />includes all work related to the management, administration, and coordination of BC activities for <br />Phases 600 through 1056. <br />Phase Assumptions: <br />• Construction phase duration will be no longer than 18 months (Notice to Proceed until <br />Physical Completion) and Services during bidding will be no longer than 3 months. <br />• If the City contracts with a third-party CM Firm, that third-party CM Firm will lead Owner <br />agency on behalf of the City with respect to the construction contract. <br />• City’s CM will set up and maintain a project document management system (DMS), including <br />holding training workshop(s), for parties to the construction contract in its use. <br />• City’s CM will establish workflows, with BC input, for submittal and RFI reviews. <br />• City will attend document management system and construction protocols training workshop <br />hosted by the City’s CM. <br />• City will engage with BC’s Construction Administrator (CA) to maintain familiarity with <br />construction progress, needs, and issues. <br />Task 1010.1 Project Work Coordination <br />Objective: Oversee and coordinate the activities of the BC project team throughout the course of the <br />project to ensure completion of the scope of work.