My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (2)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 1:43:27 PM
Creation date
4/21/2026 1:34:43 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 2
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
PGSF WMVD Storm and Combined Sewer - Construction Package 2 Grouting <br />Project No. 180162 03 60 00 - 6 <br /> <br />3.04 ADHESIVE FOR GROUTING REINFORCING BAR DOWELS <br />A. Follow manufacturer’s instructions. <br />3.05 CONCRETE REPAIR MORTAR <br />A. Concrete repair materials and procedures shall be submitted for review to the Owner’s <br />Representative and shall be accepted prior to commencement of the repair work. <br />B. Follow all manufacturer's instructions, including those for minimum and maximum <br />application thickness, surface preparation and curing. Add aggregate as required per <br />manufacturer's recommendations. Any deviations from the manufacturer's instructions <br />shall be submitted for review to the Owner’s Representative and shall be accepted prior <br />to commencement of the work. <br />3.06 CEMENT GROUT <br />A. Cement grout shall be used for grout toppings less than four inches thick and for <br />patching of fresh concrete. <br />B. Grouting shall comply with temperature and weather limitations in Section 03 30 00, <br />Cast-In-Place Concrete. <br />C. Cure grout in accordance with grout manufacturer’s instructions for prepackaged grout <br />and Section 03 30 00, Cast-In-Place Concrete, for non-prepackaged cement grout. <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.