My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (2)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 1:43:27 PM
Creation date
4/21/2026 1:34:43 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 2
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />PGSF WMVD Storm and Combined Sewer - Construction Package 2 Existing Utilities Coordination and Location <br />Project No. 180162 02 01 10 - 2 <br /> <br />5. SSMH100 Sta 10+00 (C-2206) <br />a. Field verify depth of inverts prior to demolition. Cover is bolted and bolts are <br />stripped. Coordinate work with City. . <br />6. COE 24” SS (C-1104) <br />7. PSE 12” HP Gas, WMVD (C-2060, C-2106, C-2206, C-2306, ) <br />8. PSE 6” HP Gas Lower Norton Ave (C-2060 – C-2069) <br />9. SnoPUD electric, Lower Norton Ave, Port of Everett, Norton Terminal <br />10. COE 18” SD, WMVD (C-2114, STA 70+83.76; C-2115, STA 76+55.07; C-2215, STA <br />25+01.31) <br />11. COE 12” SS HPDE FM. WMVD (C-2215, STA 24+90.23) <br />12. Telecom, WMVD and 19th St (C-2312, STA 33.54.76) <br />E. See Section 01 12 16 WORK SEQUENCE for additional requirements for utilities with the <br />Port of Everett, Norton Terminal property. <br />1. Contractor shall be responsible to coordinate completion of the Work with the City <br />and Port to protect, maintain and restore Port utilities. <br />1.02 RELATED SECTIONS <br />A. This section contains specific references to the following related sections. Additional <br />related sections may apply that are not specifically listed below. <br />1. Section 02 01 20, Protecting Existing Utilities <br />2. Section 31 50 00, Excavation Support and Protection <br />1.03 REFERENCES <br />A. This section contains references to the following documents. They are a part of this <br />section as specified and modified. Where a referenced document contains references to <br />other standards, those documents are included as references under this section as if <br />referenced directly. In the event of conflict between the requirements of this section and <br />those of the listed documents, the requirements of this section shall prevail. <br />B. Unless otherwise specified, references to documents shall mean the documents in effect <br />at the time of Advertisement for Bids or Invitation to Bid (or on the effective date of the <br />Agreement if there were no Bids). If referenced documents have been discontinued by <br />the issuing organization, references to those documents shall mean the replacement <br />documents issued or otherwise identified by that organization or, if there are no <br />replacement documents, the last version of the document before it was discontinued. <br />Where document dates are given in the following listing, references to those documents <br />shall mean the specific document version associated with that date, regardless of <br />whether the document has been superseded by a version with a later date, discontinued <br />or replaced. <br /> <br />Reference Title <br />ASCE 38-22 ASCE/UESI/CI 38-22: Standard Guideline for Investigating and Documenting <br />Existing Utilities <br />ASCE 75-22 ASCE/UESI/CI 75-22: Standard Guideline for Recording and Exchanging Utility <br />Infrastructure Data <br />COE City of Everett Design and Construction Standards & Specifications for
The URL can be used to link to this page
Your browser does not support the video tag.