Laserfiche WebLink
<br />PGSF WMVD Storm and Combined Sewer - Construction Package 2 Existing Utilities Coordination and Location <br />Project No. 180162 02 01 10 - 2 <br /> <br />5. SSMH100 Sta 10+00 (C-2206) <br />a. Field verify depth of inverts prior to demolition. Cover is bolted and bolts are <br />stripped. Coordinate work with City. . <br />6. COE 24” SS (C-1104) <br />7. PSE 12” HP Gas, WMVD (C-2060, C-2106, C-2206, C-2306, ) <br />8. PSE 6” HP Gas Lower Norton Ave (C-2060 – C-2069) <br />9. SnoPUD electric, Lower Norton Ave, Port of Everett, Norton Terminal <br />10. COE 18” SD, WMVD (C-2114, STA 70+83.76; C-2115, STA 76+55.07; C-2215, STA <br />25+01.31) <br />11. COE 12” SS HPDE FM. WMVD (C-2215, STA 24+90.23) <br />12. Telecom, WMVD and 19th St (C-2312, STA 33.54.76) <br />E. See Section 01 12 16 WORK SEQUENCE for additional requirements for utilities with the <br />Port of Everett, Norton Terminal property. <br />1. Contractor shall be responsible to coordinate completion of the Work with the City <br />and Port to protect, maintain and restore Port utilities. <br />1.02 RELATED SECTIONS <br />A. This section contains specific references to the following related sections. Additional <br />related sections may apply that are not specifically listed below. <br />1. Section 02 01 20, Protecting Existing Utilities <br />2. Section 31 50 00, Excavation Support and Protection <br />1.03 REFERENCES <br />A. This section contains references to the following documents. They are a part of this <br />section as specified and modified. Where a referenced document contains references to <br />other standards, those documents are included as references under this section as if <br />referenced directly. In the event of conflict between the requirements of this section and <br />those of the listed documents, the requirements of this section shall prevail. <br />B. Unless otherwise specified, references to documents shall mean the documents in effect <br />at the time of Advertisement for Bids or Invitation to Bid (or on the effective date of the <br />Agreement if there were no Bids). If referenced documents have been discontinued by <br />the issuing organization, references to those documents shall mean the replacement <br />documents issued or otherwise identified by that organization or, if there are no <br />replacement documents, the last version of the document before it was discontinued. <br />Where document dates are given in the following listing, references to those documents <br />shall mean the specific document version associated with that date, regardless of <br />whether the document has been superseded by a version with a later date, discontinued <br />or replaced. <br /> <br />Reference Title <br />ASCE 38-22 ASCE/UESI/CI 38-22: Standard Guideline for Investigating and Documenting <br />Existing Utilities <br />ASCE 75-22 ASCE/UESI/CI 75-22: Standard Guideline for Recording and Exchanging Utility <br />Infrastructure Data <br />COE City of Everett Design and Construction Standards & Specifications for