My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (2)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 1:43:27 PM
Creation date
4/21/2026 1:34:43 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 2
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />PGSF WMVD Storm and Combined Sewer - Construction Package 2 Existing Utilities Coordination and Location <br />Project No. 180162 02 01 10 - 3 <br /> <br />Reference Title <br />Development. Current edition <br />WSDOT Washington State Department of Transportation, Standard Specifications for Road, <br />Bridge and Municipal Construction, current edition. <br />WSDOT Washington State Department of Transportation, Standard Plan Manual, Current <br />edition. <br />1.04 SUBMITTALS <br />A. Procedures: Section 01 33 00, Submittal Procedures. <br />B. Action Submittals <br />1. Contractor’s Responsible person. <br />2. Submit potholing plan with methods to be provided, name and contact information if <br />third party subcontractors are performing the Work. <br />3. Submit Schedule for potholing to be completed for the pipeline corridor. <br />C. Construction Submittals <br />1. Submit summarized utility data including but not limited to: <br />a. Surveyed location including Northings and Eastings in the project coordinate <br />system, invert elevation, diameter, material, and location of appurtenances, <br />fittings, and connections where exposed either by potholing or exposed within the <br />excavation. Survey data shall include survey shots on any utility relocated and <br />each utility exposed in the pipe trench (one top of utility survey point on utility at <br />each side of the trench). See Section 01 32 23 SURVEY AND LAYOUT DATA. <br />b. Asphalt thickness where applicable. <br />D. Informational Submittals <br />1. Submit record copies of all permits acquired for Utility work. <br />1.05 IDENTIFICATION OF UTILITIES AND INVESTIGATIONS <br />A. Provide 811 (Call Before You Dig) prior to any excavation. <br />B. Obtain required permits and permissions prior to subsurface investigations and <br />excavation from the agency with authority over the ROW and the utility Owner. <br />C. Surface restoration, backfill and temporary surface restoration shall be in accordance <br />with the agency requirements. <br />D. Take all actions required to verify the existence, location, size, material, and condition of <br />utilities. If the Contractor’s investigations identify utilities not shown or not located as <br />shown, notify the Construction Manager immediately. <br />E. Document locating and exposing each utility; Provide survey information (N, E, Z), <br />material and service for each utility located and record the location on the Record <br />Drawings.
The URL can be used to link to this page
Your browser does not support the video tag.