My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (2)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 1:43:27 PM
Creation date
4/21/2026 1:34:43 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 2
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
PGSF WMVD Storm and Combined Sewer - Construction Package 2 Demolition and Salvage <br />Project No. 180162 02 41 00 - 2 <br /> <br />1.03 REFERENCES <br />A. This section contains references to the following documents. They are a part of this <br />section as specified and modified. Where a referenced document contains references to <br />other standards, those documents are included as references under this section as if <br />referenced directly. In the event of conflict between the requirements of this section and <br />those of the listed documents, the requirements of this section shall prevail. <br />B. Unless otherwise specified, references to documents shall mean the documents in effect <br />at the time of Advertisement for Bids or Invitation to Bid (or on the effective date of the <br />Agreement if there were no Bids). If referenced documents have been discontinued by <br />the issuing organization, references to those documents shall mean the replacement <br />documents issued or otherwise identified by that organization or, if there are no <br />replacement documents, the last version of the document before it was discontinued. <br />Where document dates are given in the following listing, references to those documents <br />shall mean the specific document version associated with that date, regardless of <br />whether the document has been superseded by a version with a later date, discontinued <br />or replaced. <br /> <br />Reference Title <br />ASCE 38-22 Standard Guideline for Investigating and Documenting Existing Utilities <br />ASCE 75-22 Standard Guideline for Recording and Exchanging Utility Infrastructure Data <br />COE City of Everett Design and Construction Standards & Specifications for Development. <br />Current edition <br />DNR Washington Department of Natural Resources Derelict Pile Removal Best Management <br />Practices for Pile Removal and Disposal <br />EPA EPA Best Management Practices for Piling Removal and Placement in Washington State <br />SMMWW Department of Ecology’s Stormwater Management Manual for Western Washington <br />WSDOT Washington State Department of Transportation, Standard Specifications for Road, <br />Bridge and Municipal Construction, current edition. <br />WSDOT Washington State Department of Transportation, Standard Plan Manual, Current <br />edition. <br />1.04 SUBMITTALS <br />A. Procedures: Section 01 33 00, Submittal Procedures <br />B. Action Submittals: <br />1. Protection Measures: Submit report, including drawings, that indicates the measures <br />proposed for protecting individuals and property, for environmental protection, for <br />dust control and, for noise control. Indicate proposed locations and construction of <br />barriers. <br />2. Pre and post-demolition Photographs or Video: Submit before Work begins and after <br />demolition is completed. <br />3. Schedule of Demolition Activities: Schedule the following activities in conjunction with <br />the requirements of Section 01 32 16. <br />4. Detailed sequence of demolition and removal work, with starting and ending dates <br />for each activity. Ensure Owner’s on-site operations are uninterrupted. <br />5. Interruption of utility services. Indicate how long utility services will be interrupted.
The URL can be used to link to this page
Your browser does not support the video tag.