My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (2)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 1:43:27 PM
Creation date
4/21/2026 1:34:43 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 2
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
PGSF WMVD Storm and Combined Sewer - Construction Package 2 Demolition and Salvage <br />Project No. 180162 02 41 00 - 7 <br /> <br />B. Equipment and materials, including piping within the limits of demolition, unless <br />otherwise specified, will become the property of the Contractor. <br />C. Drawings define minimum portion of facilities and structures to be removed. Unless <br />otherwise shown, clean saw cuts shall be made to limits of demolition shown. If cuts or <br />breaks are made exceeding limits shown, repair the cuts or breaks back to the <br />dimensions shown on Drawings at the Contractor’s expense. Submit repair procedures <br />for Construction Manager’s review. Provide saw cut at all pavement surface and curb <br />removal limits and where neat connection lines are required. <br />D. Protect structures and equipment from damage during demolition work. No equipment <br />shall be removed without the written approval of the Construction Manager. <br />E. Remove piping and duct bank from areas indicated on the drawings and as necessary to <br />install new facilities. Piping to be abandoned in place shall be capped with a watertight <br />plug at demolished end in a manner that will prevent entrance of soil, groundwater or <br />moisture. Restrained caps or plugs shall be installed at demolished ends for pressurized <br />services and where shown on the Drawings. <br />F. Only equipment specified herein, shown on the Drawings, designated by the Construction <br />Manager in the field for removal, or approved by the Construction Manager during <br />construction shall be removed. Contractor shall be responsible for the sequence of <br />equipment removal and shall remove it with minimal damage. The limits of removal of <br />equipment shall be as specified on the Drawings or as directed by the Construction <br />Manager. Equipment removal shall include removal of such items as equipment, piping <br />and accessories, supports, piping and tubing supports, fasteners, anchor bolts, and other <br />items. Removal of equipment shall include removal of conduits and wiring from <br />equipment back to nearest junction box. Removal of equipment shall include removal of <br />concrete pads that support equipment, piping and other accessories. <br />G. All other areas of the plant not within the limits of demolition work shown on the <br />Demolition Photograph, Drawings or as specified herein shall be left undisturbed. Any <br />damage to these areas during the demolition process shall be repaired or replaced to <br />original pre-contract conditions at the Contractor’s expense. <br />H. In areas where concrete portions are to be removed from a structure, the edge of <br />removal shall be cut with a concrete saw to leave a perpendicular edge or core drilled <br />when required removal is circular in shape. All reinforcing shall be cut and removed <br />unless otherwise shown or instructed. Cracked or damaged concrete shall be removed <br />to solid concrete. Spalled edges may be required to be re-sawn at the discretion of the <br />Construction Manager. <br />I. Cut off concealed or embedded conduit, boxes, anchor bolts, or other materials flush <br />with final finished surface. Where necessary, empty conduits shall be plugged with <br />fireproof sealant to maintain fire rating for wall. For existing circuits no longer needed, <br />remove conductors from the conduit. Remove all surface-mounted conduit that is no <br />longer needed. For conduit below grade or concealed within wall, cap and abandon <br />conduit in place. For existing circuits to remain operational, intercept existing conduit at <br />the most convenient location or as shown and splice and extend conduit to new location. <br />Install new conductors where required to accomplish indicated results. New conductors <br />shall be continuous without splices between J-boxes.
The URL can be used to link to this page
Your browser does not support the video tag.