KLB Construction, LLC 4/21/2026 (2)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 1:43:27 PM
Creation date
4/21/2026 1:34:43 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 2
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> <br />PGSF WMVD Storm and Combined Sewer - Construction Package 2 UST Removal and Closure <br />Project No. 180162 02 60 00 - 3 <br /> <br />3.02 UST REMOVAL <br />A. The Contractor shall conduct UST removals in accordance with WAC 173-360 and API <br />Recommended Practice 1604, “Removal and Disposal of Used Underground Petroleum <br />Storage Tank(s).” Contractor shall inert and remove the tank(s) from the site in its <br />entirety without any cutting performed on-site, unless prior approval is obtained from the <br />Engineer. <br />B. The Contractor shall remove soil from the sides of the tank(s) to facilitate tank(s) <br />removal. Contractor shall provide suitable equipment to safely and efficiently lift the <br />tanks and place on a truck for transport to an appropriate disposal or recycling facility. <br />C. The Contractor shall dispose of cleaned tanks at an appropriate scrap metal yard or <br />landfill permitted to accept such materials. The Contractor shall provide documentation <br />to the Engineer within 14 days of removal from site stating the name and address of the <br />facility where the tank was disposed, including bills of lading. The documentation shall <br />indicate the date received and a description (including size and dimensions given) of the <br />tank received. The documentation shall indicate the receiver’s intended final disposal <br />method for the tank (e.g., crushed for scrap metal, etc.). The Contractor shall obtain <br />certificates of destruction from the receiving facility for each tank removed. <br />D. If ground water is encountered, the Contractor shall dewater the excavation as necessary <br />to access the UST and provide a safe excavation. Treat and disposal of contaminated <br />groundwater and/or free product per Section 31 23 19 Dewatering. <br />3.03 UST SOIL SAMPLING AND PETROLEUM-CONTAMINATED SOIL EXCAVATION <br />A. The Contractor shall assist the Engineer in collecting soil samples from the excavation <br />using a backhoe or excavator as directed by the Engineer, per Soil Sampling and Testing <br />Coordination bid item. <br />B. The Contractor shall excavate, segregate, and stockpile soils at the direction of Engineer <br />per Section 02 61 00 Removal and Disposal of Contaminated Soils. <br />C. The Contractor shall dispose or reuse soils at the direction of Engineer per Section 02 61 <br />00 Removal and Disposal of Contaminated Soils. <br />D. The Contractor shall secure and leave UST excavations open for up to three days <br />(excluding weekends and pending analytical results) before receiving additional direction <br />from the Engineer to backfill the excavation or excavate additional soils. <br />E. The Contractor shall provide suitable barricades, fencing, signing and other warning and <br />safety devices to protect the public and other site workers from open excavations, heavy <br />equipment, and other construction activities. Contractor shall provide earthen or other <br />berms to prevent surface or storm water from entering open excavations. <br />F. The Contractor shall backfill and compact the excavation to grade as directed by the <br />Engineer. <br />END OF SECTION