My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (2)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 1:43:27 PM
Creation date
4/21/2026 1:34:43 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 2
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />PGSF WMVD Storm and Combined Sewer - Construction Package 2 Removal and Disposal of Contaminated Soils <br />Project No. 180162 02 61 00 - 4 <br /> <br />2. Site personnel working with contaminated material: <br />a. Received site specific training <br />b. Minimum three (3) years of experience with similar work <br />3. For above Level D protection: <br />a. Have received appropriate safety training in compliance with 29 CFR 1910.120, <br />29 CFR 1910.134, and WAC 296-843-100 <br />b. Minimum of 40 hours health and safety training <br />c. Minimum 24 hours of “on the job” training <br />d. Eight (8) hours annual refresher training <br />e. Annual medical monitoring by an occupational physician <br />B. Perform contamination excavation and disposal work in compliance with applicable <br />statutes and regulations, including the Washington State Model Toxics Control Act, <br />chapter 70.305 RCW (“MTCA”) and associated regulations and Washington State <br />Department of Ecology Guidance. <br />C. Independent Testing Firm: Use an Independent consulting or testing firm with <br />qualifications and experience in contaminated soil and water sampling, analysis, <br />cleanup, and regulatory compliance, with the appropriate Washington State licensed <br />professionals supervising and conducting the work. <br />D. Perform contamination excavation and disposal work in compliance with applicable <br />statutes and regulations, including the Washington State Model Toxics Control Act, <br />chapter 70.105D RCW (“MTCA”). <br />PART 2 NOT USED <br />PART 3 EXECUTION <br />3.01 CONTAMINATED MATERIAL SAMPLING <br /> <br />A. Soil removed from the Port of Everett shall require sampling and testing for potential <br />contamination prior to removal and shall be tested by the contractor. Typical number of <br />samples for chemical analysis is one sample per 1,000 Cubic Yards for compliance with <br />the project SGMP. For compliance with the SGMP the following tests shall be performed. <br /> <br />Table 1. Excavated Soil Waste Characterization Testing Constituents and Methods <br />Analyte Testing Method <br />TPH, gasoline NWTPH-Gx <br />TPH, diesel, oil NWTPH-Dx <br />Metals (arsenic, copper, lead, mercury, nickel and zinc) EPA 6000/7000 <br />PAHs with low level SIM EPA 8270E/SIM
The URL can be used to link to this page
Your browser does not support the video tag.