My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (2)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 1:43:27 PM
Creation date
4/21/2026 1:34:43 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 2
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />PGSF WMVD Storm and Combined Sewer - Construction Package 2 Concrete Repair <br />Project No. 180162 03 01 00 - 3 <br /> <br />2. Include construction details, material data sheets, chemical composition, physical <br />properties, test data, and mixing information. <br />3. Include custom, project specific selections with preparation and application <br />instructions for repair materials per manufacturer’s recommendations. <br />4. Coordinate repair materials with protective coating submittals per Section 09 96 00 <br />and provide written confirmation from coating manufacturer regarding compatibility <br />of coating with selected repair products. <br />5. Standard submittal documents are required, marked up to indicate selected products <br />and applicable information. Indicate locations of Contractor requested substitutions. <br />Do not submit full catalogs. Do not submit MSD sheets. <br />1.07 INFORMATIONAL SUBMITTALS <br />A. Qualification Data: For Specialty concrete repair Contractor and manufacturers, plus <br />Specialty coating Contractor and manufacturer, based on Quality Assurance <br />requirements below. <br />B. Product Test Reports: For each manufacturer and each product, including: bonding <br />agent, cementitious patching mortar, joint-filler, crack-injection adhesive, and structural <br />reinforcement; for tests performed by manufacturer and witnessed by a qualified testing <br />agency. <br />C. Quality-Control Program: Submit before work begins; to include product manufacturer <br />approval of installation personnel. <br />D. Field quality-control tests and observation reports provided by Contractor and product <br />manufacturer representatives. Include pH testing, maximum and minimum surface <br />temperature records, daily maximum and minimum ambient air temperature and <br />humidity readings, and wind speeds prior to and for 48 hours after product installation. <br />1.08 QUALITY ASSURANCE <br />A. Manufacturer Qualifications: Each product manufacturer shall employ factory-authorized <br />service representatives who are available for consultation and Project-site inspection and <br />assistance. <br />1. Coordinate services of the repair/coating product manufacturer’s representative(s) <br />to: attend the preconstruction meeting, provide additional field training, be on-site to <br />monitor mockup, examine surfaces after preparation, mixing of products and <br />application; and be available as-needed thereafter during repair/coating production, <br />provide follow-up observation of curing and finished repair/coating, provide on-site <br />trouble shooting and corrective procedures. <br />2. A single source Manufacturer shall provide all products used in the “system” for <br />restoration of concrete surface including protective coatings per Section 09 96 00. <br />Where more than one manufacturer’s products are used in the “system”, each <br />manufacturer shall provide a complete list of all products in the “system”, including <br />the selected products from other manufacturer’s and provide a statement regarding <br />acceptance of compatibility.
The URL can be used to link to this page
Your browser does not support the video tag.