Laserfiche WebLink
<br />PGSF WMVD Storm and Combined Sewer - Construction Package 2 Concrete Repair <br />Project No. 180162 03 01 00 - 3 <br /> <br />2. Include construction details, material data sheets, chemical composition, physical <br />properties, test data, and mixing information. <br />3. Include custom, project specific selections with preparation and application <br />instructions for repair materials per manufacturer’s recommendations. <br />4. Coordinate repair materials with protective coating submittals per Section 09 96 00 <br />and provide written confirmation from coating manufacturer regarding compatibility <br />of coating with selected repair products. <br />5. Standard submittal documents are required, marked up to indicate selected products <br />and applicable information. Indicate locations of Contractor requested substitutions. <br />Do not submit full catalogs. Do not submit MSD sheets. <br />1.07 INFORMATIONAL SUBMITTALS <br />A. Qualification Data: For Specialty concrete repair Contractor and manufacturers, plus <br />Specialty coating Contractor and manufacturer, based on Quality Assurance <br />requirements below. <br />B. Product Test Reports: For each manufacturer and each product, including: bonding <br />agent, cementitious patching mortar, joint-filler, crack-injection adhesive, and structural <br />reinforcement; for tests performed by manufacturer and witnessed by a qualified testing <br />agency. <br />C. Quality-Control Program: Submit before work begins; to include product manufacturer <br />approval of installation personnel. <br />D. Field quality-control tests and observation reports provided by Contractor and product <br />manufacturer representatives. Include pH testing, maximum and minimum surface <br />temperature records, daily maximum and minimum ambient air temperature and <br />humidity readings, and wind speeds prior to and for 48 hours after product installation. <br />1.08 QUALITY ASSURANCE <br />A. Manufacturer Qualifications: Each product manufacturer shall employ factory-authorized <br />service representatives who are available for consultation and Project-site inspection and <br />assistance. <br />1. Coordinate services of the repair/coating product manufacturer’s representative(s) <br />to: attend the preconstruction meeting, provide additional field training, be on-site to <br />monitor mockup, examine surfaces after preparation, mixing of products and <br />application; and be available as-needed thereafter during repair/coating production, <br />provide follow-up observation of curing and finished repair/coating, provide on-site <br />trouble shooting and corrective procedures. <br />2. A single source Manufacturer shall provide all products used in the “system” for <br />restoration of concrete surface including protective coatings per Section 09 96 00. <br />Where more than one manufacturer’s products are used in the “system”, each <br />manufacturer shall provide a complete list of all products in the “system”, including <br />the selected products from other manufacturer’s and provide a statement regarding <br />acceptance of compatibility.